[1-3 Working with Refrigerant Piping ]
10 -
chapter 1
BS_01_C
1
Che
ck Bef
o
re
Se
rvicing
1-3-3
Vacuum Drying
1. Vacuum pump with a reverse-flow check valve (Photo1)
To prevent the vacuum pump oil from flowing into the refrigerant circuit during power OFF or power failure, use a vacuum
pump with a reverse-flow check valve.
A reverse-flow check valve may also be added to the vacuum pump currently in use.
2. Standard of vacuum degree (Photo 2)
Use a vacuum pump that attains 0.5Torr(65Pa) or lower degree of vacuum after 5 minutes of operation, and connect it directly
to the vacuum gauge. Use a pump well-maintained with an appropriate lubricant. A poorly maintained vacuum pump may not
be able to attain the desired degree of vacuum.
3. Required precision of vacuum gauge
Use a vacuum gauge that registers a vacuum degree of 5Torr(650Pa) and measures at intervals of 1Torr(130Pa). (A recom-
mended vacuum gauge is shown in Photo2.)
Do not use a commonly used gauge manifold because it cannot register a vacuum degree of 5Torr(650Pa).
4. Evacuation time
After the degree of vacuum has reached 5Torr(650Pa), evacuate for an additional 1 hour. (A thorough vacuum drying re-
moves moisture in the pipes.)
Verify that the vacuum degree has not risen by more than 1Torr(130Pa) 1hour after evacuation. A rise by less than
1Torr(130Pa) is acceptable.
If the vacuum is lost by more than 1Torr(130Pa), conduct evacuation, following the instructions in section 6. Special vacuum
drying.
5. Procedures for stopping vacuum pump
To prevent the reverse flow of vacuum pump oil, open the relief valve on the vacuum pump side, or draw in air by loosening
the charge hose, and then stop the operation.
The same procedures should be followed when stopping a vacuum pump with a reverse-flow check valve.
6. Special vacuum drying
When 5Torr(650Pa) or lower degree of vacuum cannot be attained after 3 hours of evacuation, it is likely that water has pen-
etrated the system or that there is a leak.
If water infiltrates the system, break the vacuum with nitrogen. Pressurize the system with nitrogen gas to
0.5kgf/cm
2
G(0.05MPa) and evacuate again. Repeat this cycle of pressurizing and evacuation either until the degree of vac-
uum below 5Torr(650Pa) is attained or until the pressure stops rising.
Only use nitrogen gas for vacuum breaking. (The use of oxygen may result in an explosion.)
(Photo1) 15010H
(Photo2) 14010
Recommended vacuum gauge:
ROBINAIR 14010 Thermistor Vacuum Gauge
0000004491.BOOK 10 ページ 2017年12月26日 火曜日 午後1時10分
Содержание PFD-P250VM-E
Страница 1: ...AIR CONDITIONER 2017 Service Handbook PUHY P250YNW A PUHY P500YSNW A PFD P250VM E PFD P500VM E Model ...
Страница 11: ...GB_BS_01_C 0000004491 BOOK 2 ページ 2017年12月26日 火曜日 午後1時10分 ...
Страница 27: ...GB_BS_02_C 0000004492 BOOK 2 ページ 2018年1月5日 金曜日 午前10時12分 ...
Страница 49: ...GB_BS_03_C 0000004493 BOOK 2 ページ 2018年1月5日 金曜日 午前9時11分 ...
Страница 71: ...GB_BS_04_C 0000004494 BOOK 2 ページ 2017年12月26日 火曜日 午前11時43分 ...
Страница 89: ...GB_BS_05_C 0000004495 BOOK 2 ページ 2017年12月26日 火曜日 午前11時44分 ...
Страница 117: ...GB_BS_06_C 0000004496 BOOK 2 ページ 2017年12月26日 火曜日 午前11時45分 ...
Страница 281: ...GB_BS_09_A1 0000004538 BOOK 2 ページ 2017年12月25日 月曜日 午後7時48分 ...
Страница 299: ...GB_BS_10_C 0000004550 BOOK 2 ページ 2017年12月26日 火曜日 午後12時1分 ...