[5-2 Outdoor Unit Control ]
BS_05_C
chapter 5 -
13
5
Cont
rol
(2) P500YSNW model
The compressor on the OC starts up.
The air conditioning load
is large enough to require a simultaneous
operation of OC and OS.
Initial startup mode starts.
F 60Hz
Yes
No
or F < 50Hz (both OC and OS)
Completed in the integrated operation time of 90 minutes.
The compressor on the OC remains in operation, and the
compressor on the OS starts up.
or F < 50Hz (OC)
Completed in the integrated operation time of 90 minutes.
The compressor on the OC starts up.
Both the OC and OS stop.
The startup sequence of the OC and OS is rotated.
or F < 50Hz (OS)
Completed in the integrated operation time of 90 minutes.
The compressor on the OS starts up.
*1
*2
*1
The air conditioning load is too small for both the OC and the OS to
simultaneously stay in operation.
*2
The air conditioning load is high enough for both OC and OS to
simultaneously stay in operation.
Initial startup mode complete
or the discharge superheat (TH4 - Tc) is detected (within
5 minutes of startup) that remains above approximately
25 degrees for one minute or if the shell bottom SH
(TH15-Te) is 15 deg or above (for continuous 5 minutes)
10 minutes after start up.
or the discharge superheat (TH4 - Tc) is detected (within
5 minutes of startup) that remains above approximately
25 degrees for one minute or if the shell bottom SH
(TH15-Te) is 15 deg or above (for continuous 5 minutes)
10 minutes after start up.
or the discharge superheat (TH4 - Tc) is detected (within
5 minutes of startup) that remains above approximately
25 degrees for one minute or if the shell bottom SH
(TH15-Te) is 15 deg or above (for continuous 5 minutes)
10 minutes after start up.
50 F 60Hz (both OC and OS)
Completed in the integrated operation time of 35 minutes.
50 F 60Hz (OC)
Completed in the integrated operation time of 35 minutes.
50 F 60Hz (OS)
Completed in the integrated operation time of 35 minutes.
0000004495.BOOK 13 ページ 2017年12月26日 火曜日 午前11時44分
Содержание PFD-P250VM-E
Страница 1: ...AIR CONDITIONER 2017 Service Handbook PUHY P250YNW A PUHY P500YSNW A PFD P250VM E PFD P500VM E Model ...
Страница 11: ...GB_BS_01_C 0000004491 BOOK 2 ページ 2017年12月26日 火曜日 午後1時10分 ...
Страница 27: ...GB_BS_02_C 0000004492 BOOK 2 ページ 2018年1月5日 金曜日 午前10時12分 ...
Страница 49: ...GB_BS_03_C 0000004493 BOOK 2 ページ 2018年1月5日 金曜日 午前9時11分 ...
Страница 71: ...GB_BS_04_C 0000004494 BOOK 2 ページ 2017年12月26日 火曜日 午前11時43分 ...
Страница 89: ...GB_BS_05_C 0000004495 BOOK 2 ページ 2017年12月26日 火曜日 午前11時44分 ...
Страница 117: ...GB_BS_06_C 0000004496 BOOK 2 ページ 2017年12月26日 火曜日 午前11時45分 ...
Страница 281: ...GB_BS_09_A1 0000004538 BOOK 2 ページ 2017年12月25日 月曜日 午後7時48分 ...
Страница 299: ...GB_BS_10_C 0000004550 BOOK 2 ページ 2017年12月26日 火曜日 午後12時1分 ...