-83-
(12) Refrigerant recovery control
Refrigerant recovery is conducted to prevent refrigerant from accumulating in the stopped unit (fan unit), the unit
cooling mode and that with heating thermostat being turned off.
under
1) Start of refrigerant recovery
Refrigerant recovery is started when the two items below are fully satisfied.
• 30 minutes has passed after finishing refrigerant recovery.
• The variable capacity unit level detector or the constant capacity unit level detector detects AL = 0 for 3
continuously, or the discharge SH is high.
minutes
2) Refrigerant recovery operation
•
Refrigerant is recovered by opening LEV of the objective indoor units (indoor units under stop. fan, and
modes, and that with heating thermostat being turned off) for 30 seconds.
cooling
•
The regular capacity control of the outdoor unit and the regular LEV control of the indoor unit are not applied
refrigerant recovery operation, but are fixed with the value before the recovery operation. These
conducted one minute after finishing the recovery operation.
controls will be
•
Defrosting operation is prohibited during the recovery operation, and it will be conducted after finishing the
operation.
recovery
(13) Outdoor unit heat exchanger capacity control
Variable capacity unit
1) Control method
•
In order to stabilize the evaporation temperature during cooling and the high-pressure pressure during heating that
required in response to performance needs, the capacity of the outdoor heat exchanger is controlled by
are
fan volume of the outdoor unit by phase control and controlling the number of fans and by using
regulating the
2) Control
•
When both of the compressors are stopped, the fans for the outdoor units are also stopped.
•
The fans operate at full speed for 10 seconds after starting.
•
The fans for the outdoor unit are stopped during defrosting.
3) Capacity control pattern
Constant capacity unit
1) Control Method
•
In response to performance needs, the fan level is controlled by the same phase control used in the
capacity unit.
variable
2) Control
•
The fan is stopped when the (constant capacity unit) compressor is stopped.
•
The fan is operated at full speed for 5 seconds after the (constant capacity unit) compressor is started.
•
The fan for the outdoor unit is stopped during defrosting.
•
The fan is sometimes operated when the TH10a drops, even when the compressor is stopped.
•
The fan is operated for several minutes after the compressor is stopped.
Note 1:
Note 2: When there is conductivity at SV7, it is open. When there is no conductivity at SV7, it is closed.
Note 3: When the unit is stopped, and SV5b and SV8 are open. SV7 is close.
When there is conductivity at SV5b and SV8, it is closed. When there is no conductivity at SV5b and
SV8, it is open.
Starts
LEV opening
before change
LEV opening at refrigerant recovery
(Indoor unit LEV opening 500 pulse)
Finish
30 seconds
Operating mode Capacity control pattern Heat exchanger capacity No. of fans Phase control
Notes
50 %
25 %
1
1
10 to 100 %
10 to 100 %
100 %
2
10 to 100 %
100 %
2
10 to 100
%
100 %
0
0
%
Cooling
Heating
Defrosting
21S4bON,SV7ON
SV5bON,SV8OFF
21S4bON,SV7OFF
SV5bON,SV8ON
21S4bOFF,SV7ON
SV5bOFF,SV8OFF
21S4bON,SV7ON
SV5bOFF,SV8OFF
21S4bOFF,SV7ON
SV5bOFF,SV8OFF
during
the solenoid valves.
1
1
1
1
2
3
Содержание 500YEMK-A
Страница 15: ... 12 FANCON board G A board CNFAN CNFC2 CNPOW CNE CNDC1 CN15V1 CNDR1 CNIPM1 ...
Страница 16: ... 13 Y C board SNB board ...
Страница 17: ... 14 RELAY board CNRT2 CNCH CN52C2 CN52F CN51C2 CNOUT2 ...
Страница 19: ... 16 CONT board CNTR SWU2 SWU1 SW3 SW2 CNS1 M NET transmission CNFC1 CN20 Power supply 1 N 3 L1 ...
Страница 20: ... 17 FANCON board CNW CNV CNU CNFC2 ...
Страница 207: ... 204 ...