-199-
•
PREPARATION, REPAIRS AND REFRIGERANT REFILLING WHEN REPAIRING
LEAKS
[1] Location of leaks: Extension piping or indoor units (when cooling)
(Pump down operation)
1
Attach a pressure gage to the low-pressure servicing check joint (CJ2).
2
Stop all of the indoor units. When the compressor has stopped, shut off the liquid ball valve (BV2) for the outdoor
unit.
3
Stop all of the indoor units. When the compressor has stopped, turn the SW3-6 switch on the main board for the
outdoor unit to ON. (This will start the pump down operation causing all of the indoor units to enter the cooling
mode.)
4
While in the pump down operation (SW3-6 ON), the low pressure (LPS) will reach belo
down operation. Shut down all of the indoor units and the compressor if the pressure gage for the low-
pressure servicing joint (CJ2) reads 0.15 MPa or after running the pump down operation for 20 minutes.
5
Shut off the gas ball valve (BV1) for the outdoor unit.
6
Remove any refrigerant remaining in the extension piping and the indoor units.
Be sure to recover the refrigerant without releasing it into the air.
7
Repair the location of the leak.
8
After repairing the leak, create a vacuum to remove any air from inside of the extension piping or the indoor
units.
9
Open the ball valves for the outdoor unit (BV1 and BV2), turn the SW3-6 switch to OFF, adjust refrigerant levels
and confirm proper circulation.
w at least 0.20 MPa
or the indoor unit and the compressor will automatically shut down within 15 minutes of starting the pump
Содержание 500YEMK-A
Страница 15: ... 12 FANCON board G A board CNFAN CNFC2 CNPOW CNE CNDC1 CN15V1 CNDR1 CNIPM1 ...
Страница 16: ... 13 Y C board SNB board ...
Страница 17: ... 14 RELAY board CNRT2 CNCH CN52C2 CN52F CN51C2 CNOUT2 ...
Страница 19: ... 16 CONT board CNTR SWU2 SWU1 SW3 SW2 CNS1 M NET transmission CNFC1 CN20 Power supply 1 N 3 L1 ...
Страница 20: ... 17 FANCON board CNW CNV CNU CNFC2 ...
Страница 207: ... 204 ...