-101-
<Initial Start Control Timingchart>
For steps 1 - 3
Note 1: If the frequency of No. 1 compressor is above the specified level at the end of Step 2, the mode proceeds to
Step 3.
Note 2: At the completion of Step 2, if the frequency of No. 1 compressor is below the specified value and if Step 2 has
been completed less than 3 times, the process does not proceed to Step 3 but rather enters the Pause Step
and then repeats Step 2.
Note 3: At the completion of Step 2, if it has been completed more than 3 times, the mode will proceed to Step 3 even
if the frequency of No. 1 compressor is below the specified value.
30 minutes
Step 1
3
minutes
10 minutes
Step 2
5 minutes
Step 3
ON/OFF of
No.1 compressor
ON/OFF of
No.2 compressor
End of initial operation mode
Note 1
30 minutes
Step 1
3
minutes
10 minutes
Step 2
3
minutes
10 minutes
Step 2
5 minutes
Step 3
Note 1
ON/OFF of
No.1 compressor
ON/OFF of
No.2 compressor
Note 2
End of initial operation mode
30 minutes
Step 1
3
minutes
10 minutes
Step 2
3
minutes
10 minutes
Step 2
3 times
3
minutes
10 minutes
Step 2
5 minutes
Step 3
Note 3
ON/OFF of
No.1 compressor
ON/OFF of
No.2 compressor
Note 2
End of initial operation mode
(Example 1)
(Example 2)
(Example 3)
Содержание 500YEMK-A
Страница 15: ... 12 FANCON board G A board CNFAN CNFC2 CNPOW CNE CNDC1 CN15V1 CNDR1 CNIPM1 ...
Страница 16: ... 13 Y C board SNB board ...
Страница 17: ... 14 RELAY board CNRT2 CNCH CN52C2 CN52F CN51C2 CNOUT2 ...
Страница 19: ... 16 CONT board CNTR SWU2 SWU1 SW3 SW2 CNS1 M NET transmission CNFC1 CN20 Power supply 1 N 3 L1 ...
Страница 20: ... 17 FANCON board CNW CNV CNU CNFC2 ...
Страница 207: ... 204 ...