[1]- 3 PUHY-P600·650·700·750 YSEM-A
(1)
Initial processing
• When turning on power source, initial processing of microcomputer is given top priority.
• During initial processing, control processing corresponding to operation signal is suspended. The control
is resumed after initial processing is completed. (Initial processing: Data processing in
setting of each LEV opening, requiring approx. 2 minutes at the maximum.)
microcomputer and initial
(2)
Control at staring
• At startup, variable capacity unit operations will start first.
• For 3 minutes after starting, 60 Hz is the upper frequency limit. (When only No. 1 compressor is operating.)
• 75 Hz is the upper limit for the 30 minutes after the compressor has started operation.
• Normal control is performed after the initial start mode (described later) has been completed.
(3)
Compressor capacity control
• Compressor is performed by the variable capacity compressor on the variable capacity unit (No. 1: inverter motor)
and constant capacity compressor (No. 2: It has capacity control switching).
• In response to the required performance, the number of compressors operating, the switching of capacity control
and the frequency of the variable capacity compressor is controlled so that the evaporation temperature is
between – 2 and – 6˚C in cooling mode and that the condensation temperature is 49˚C in heating mode.
• The fluctuation of the frequency of the variab
second.
20 to 100 Hz (TH6 20˚C in cooling mode, or in heating mode)
30 to 100 Hz (TH6 20˚C in cooling mode)
1) No. 2 compressor operation, stopping and full-load/un-load switching
Switching from stop to run of No. 2 compressor.
When the required performance cannot be obtained by only No. 1 compressor, the No. 2 compressor will be
started. (The No. 2 compressor will be started in un-load operation.)
• After the No. 1 compressor has reached 100 Hz, the No. 2 compressor stops
un-load or un-load
full-load.
Switching from run to stopping of No. 2 compressor.
When the required performance is exceeded when the two compressors, No. 1 and No. 2, are operating, the No.
2 compressor is stopped. (The No. 2 compressor will be performed in un-load operation.)
Switching from un-load to full-load of No. 2 compressor.
When the required performance cannot be obtained by the No. 1 compressor and the No. 2 compressor operat-
ing in un-load, the No. 2 compressor will be switched to full-load operation.
Switching from full-load to un-load of No. 2 compressor.
When the required performance is exceeded when the two compressors, No.1 and No. 2 operating in full-load,
the No 2 compressor will be switched to un-load operation.
2) No. 3 compressor operation/stopping.
Switching No. 3 compressor from stopping to operation
When the required performance cannot be obtained with only the No. 1 and No. 2 variable capacity unit com-
pressors, the constant capacity unit No. 3 compressor will be started.
❇
The No. 3 compressor is equipped with a capacity control switching function. It starts with un-load operation
in the initial start mode and during defrosting, and starts in full-load operation at all other times.
No.3
No.1 No.2
Constant
capacity
unit
Variable
capacity
unit
processing
1
2
3
4
1
le capacity compressor is as follows. It is performed at 3 Hz per
Содержание 500YEMK-A
Страница 15: ... 12 FANCON board G A board CNFAN CNFC2 CNPOW CNE CNDC1 CN15V1 CNDR1 CNIPM1 ...
Страница 16: ... 13 Y C board SNB board ...
Страница 17: ... 14 RELAY board CNRT2 CNCH CN52C2 CN52F CN51C2 CNOUT2 ...
Страница 19: ... 16 CONT board CNTR SWU2 SWU1 SW3 SW2 CNS1 M NET transmission CNFC1 CN20 Power supply 1 N 3 L1 ...
Страница 20: ... 17 FANCON board CNW CNV CNU CNFC2 ...
Страница 207: ... 204 ...