-44-
(5)
Check points for system structure
In the case of the PUHY-(P) 400·500 YEM(K,C)-A
Check points from installation work to test run.
Classification Portion
Check item
Trouble
Installation
and piping
Power source
wiring
1
2
Instruction for selecting combination of outdoor unit, and
indoor unit followed? (Maximum number of indoor units
which can be connected, connecting model name, and
total capacity.)
Specified switch capacity and wiring diameter of main
power source used?
Proper grounding work done on outdoor unit?
The phases of the L line (L1, L2, L3) correct?
L line and N line connected correct?
Not operate.
Not cool (at cooling).
Not heat (at heating).
Not cool, not heat, error stop.
Condensation drip in piping.
Not cool, not heat, error stop.
Water leak, condensation drip in
drain piping.
Error stop, not operate.
Electric shock.
Error stop, not operate.
Some electric parts will be damaged.
1
2
3
4
3
4
5
6
7
8
1
2
3
4
Branch pipe properly selected?
Refrigerant piping diameter correct?
Refrigerant leak generated at connection?
Insulation work for piping properly done?
Specified amount of refrigerant replenished?
Pitch and insulation work for drain piping properly done?
Connecting piping size of branch piping correct?
57
246
Switch
Breakers for
Current Leakage
Power source
for outdoor unit
PE
246
Power source
for indoor unit
Содержание 500YEMK-A
Страница 15: ... 12 FANCON board G A board CNFAN CNFC2 CNPOW CNE CNDC1 CN15V1 CNDR1 CNIPM1 ...
Страница 16: ... 13 Y C board SNB board ...
Страница 17: ... 14 RELAY board CNRT2 CNCH CN52C2 CN52F CN51C2 CNOUT2 ...
Страница 19: ... 16 CONT board CNTR SWU2 SWU1 SW3 SW2 CNS1 M NET transmission CNFC1 CN20 Power supply 1 N 3 L1 ...
Страница 20: ... 17 FANCON board CNW CNV CNU CNFC2 ...
Страница 207: ... 204 ...