3-1-8
2AR
1. Install the optional devices (eject unit, feedshift unit, bypass unit*, job separator,
duplex unit, SRDF and/or original cover*) as necessary (see the respective
installation manuals or service manuals).
Note: Be sure to install either the eject unit or feedshift unit.
* Standard for 220 - 240 V specifications.
1. Open the front cover, left 1 cover and the paper transfer section cover.
2. Remove the two screws and detach the image formation unit.
Image formation unit
Screws
Figure 3-1-9
Install the optional devices.
Remove the image formation unit.
Содержание PointSource Ai 3010
Страница 1: ...3010 S M MCA SERVICE MANUAL Published in Apr 00 2AR70765 Revision 5 PointSource Ai 3010 R...
Страница 2: ...Service Manual PointSource Ai 3010...
Страница 13: ...3010 S M MCA THEORY AND CONSTRUCTION SECTION I I Theory and Construction Section...
Страница 14: ...2AR CONTENTS 1 1 Specifications 1 1 1 Specifications 1 1 1...
Страница 18: ...2AR CONTENTS 1 2 Handling Precautions 1 2 1 Drum 1 2 1 1 2 2 Developer and toner 1 2 1...
Страница 61: ...3010 S M MCA ELECTRICAL SECTION II II Electrical Section...
Страница 62: ...2AR CONTENTS 2 1 Electrical Parts Layout 2 1 1 Electrical parts layout 2 1 1 1 Copier 2 1 1...
Страница 92: ...3010 S M MCA III Set Up and Adjustment Section III SET UP AND ADJUSTMENT SECTION...
Страница 108: ...3 1 15 2AR This page has been left blank intentionally 2AR 5...
Страница 136: ...3 2 11 2AR 1 This page is intentionally left blank...
Страница 191: ...3 2 62 2AR 1 This page is intentionally left blank...
Страница 196: ...3 2 61 2AR 1 This page is intentionally left blank...
Страница 255: ...3 2 38 2AR 1 This page is intentionally left blank...
Страница 384: ...2AR 1 3 6 15 This page is intentionally left blank...
Страница 398: ...3 6 27 2AR 1 3 Main PCB CN9 CN5 CN2 CN3 CN4 IC11 IC12 CN1 CN8 CN10 CN11 CN6 CN7...
Страница 431: ...2AR General connection diagram 3 7 43 General wiring diagram 3 7 44 2AR 1...