ELECTRICAL SAFETY INSPECTION
7- Mains on Applied Part Leakage
4) Press shortcut key 7. The Mains on Applied Part test is displayed.
5) Select the desired outlet configuration and applied part to test using the
appropriate SOFT KEYS:
6) Press START TEST (SOFT KEY 1) to begin the test.
7) Press the print data key to generate a printout of the latest measurement.
Figure 3 Mains on Applied part leakage
NOTE
1, In addition to Probes ,Patient leakage current test should be perform if ECG
or PCG parts used;
2, If all of the applied parts correspond to the instrument type, the applied parts
will be tied together and one reading will be taken. If any of the applied parts differ
from the instrument type, all applied parts will be tested individually, based on the
type of applied part. This applies to Auto and Step modes only.
Failure
Check any broken of the Applied part. Replace any defective one.
Check any broken of the ECG/PCG module if used, Replace any defective
one.
Check any broken of the Power Unit. Replace a new one if any portion
defective.
Inspect wiring for bad crimps, poor connections, or damage.
Test the wall outlet; verify it is grounded and is free of other wiring
abnormalities. Notify the user or owner to correct any deviations. As a work
around, check the other outlets to see if they could be used instead.
Change another probe to confirm if the fail is caused by console.
Содержание Zonare ZS3
Страница 1: ...ZS3 Diagnostic Ultrasound System Service Manual ...
Страница 34: ...ZS3 Service Manual Page 34 of 295 4 System Overview Major System Assemblies Figure 4 1 ZS3 System ...
Страница 120: ...ZS3 Service Manual Page 120 of 295 FTP Setup Enters Setup Network FTP ...
Страница 124: ...ZS3 Service Manual Page 124 of 295 ...
Страница 131: ...ZS3 Service Manual Page 131 of 295 13 System Diagrams ...
Страница 132: ...ZS3 Service Manual Page 132 of 295 Power Block Diagram Figure 13 1 ZS3 Power Block Diagram ...
Страница 133: ...ZS3 Service Manual Page 133 of 295 Cabling Diagram Figure 13 2 ZS3 Cabling Diagram ...
Страница 134: ...ZS3 Service Manual Page 134 of 295 System Block Diagram Figure 13 3 ZS3 Overall System Block Diagram ...
Страница 138: ...ZS3 Service Manual Page 138 of 295 Figure 14 6 ZS3 ...
Страница 157: ...ZS3 Service Manual Page 157 of 295 8 The system performs the second automatic reboot and enters the following page ...
Страница 185: ...ZS3 Service Manual Page 185 of 295 17 Preventative Maintenance Forms ...
Страница 217: ...ZS3 Service Manual Page 217 of 295 Figure 18 8 ZS3 ...
Страница 252: ...ZS3 Service Manual Page 252 of 295 Figure 19 43 ZS3 Power Cable USB Cable ...
Страница 295: ...P N 046 014026 00 2 0 ...