© 2013 MIMAKI ENGINEERING CO.,LTD.
6.2.2
P.2
6.2.2 Head Unit
R.1.0
Assembling procedure
1. When the head is replaced with new one, wet the inside of each
nozzle with the MS cleaning liquid (approx. 10cc) before
assembling.
2. Connect the head FFC with the head unit.
3. Insert the AD shaft into the mounting hole of carriage base.
4. Mount the head unit on the carrige.
5. Connect the ink tube with the head.
6. Mount the
head relay PCB
on the carrige.
7. Connect the head cable with the head relay PCB.
8. Remove the AD shaft from the carriage base.
9. Check “
3.1.1 Replacement of the Head Unit
”, and to the
next process.
Syringe
10
μ
m filter
Cleaning liquid
Cleaning
liquid
Washings to use: MS cleaning liquid
At supplying the liquid, supply the liquid slowly not
to apply force, using a syringe and 10
μ
m filter.
AD shaft mount positions (x4)
The screws are acceptable to be temporary-fixed
since the head position is adjusted following the
assembling of head unit.
Head1
Head2
Head3
Head4
Head1
Head2
4-head model
2-head model
M
C
M C
M
C
M C
Y
K
Y K
Y
K
Y K
M
C
M C
Y
K
Y K
Check the left figure, and connect them correctly.
Check the contents of “Head cable connection” of
the next page, and connect the head cable surely.
MAINTENANCE MANUAL > Disassembly and Reassembly > Ink-related Parts > Head Unit
Model
SWJ-320S
Issued 2012.07.19 Revised
F/W ver
Remark
1.0