![MHM iQ-Oval CDS Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/mhm/iq-oval-cds/iq-oval-cds_operating-instructions-manual_1783429015.webp)
Operating instructions iQ-Oval CDS V1-4.docx
page 15 of 66
4.4.
Packaging material
After unpacking the machine, the packaging material must be disposed of according
to local regulations.
5.
Assembly
This section describes the external supply/connection ports of the iQ-Oval CDS and the
points to be observed during assembly.
5.1.
General Assembly Instructions
The customer should have a minimum of two persons available to assist the technician
with the installation and assembly of the machine.
5.2.
Positioning of the iQ-Oval CDS
The machine must be mounted on a bed with sufficient load-bearing capacity. In case
of doubt this capacity has to be examined by a structural engineer.
In order to guarantee perfect installation and smooth operation of the iQ-Oval CDS,
the machine must be installed at a sufficient distance from adjacent elements of the
building (walls, columns, etc.) and/or other machines. The distance required in each
case depends on the screen size and must be chosen so as to allow the operator to
replace the screens without any problems. The dimensions of the respective machine
are indicated in Chapter 3
The iQ-Oval CDS must only be installed / assembled by an authorized
MHM service technician or by an authorized service technician from
an official MHM dealer/agent. Any assembly/installation by any third
party not listed above will result in immediate cancellation of the
warranty.