![MHM iQ-Oval CDS Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/mhm/iq-oval-cds/iq-oval-cds_operating-instructions-manual_1783429026.webp)
Operating instructions iQ-Oval CDS V1-4.docx
page 26 of 66
d evic e on
d evic e on
+ 24V
GND
+ 24V
+ 24V
GND
GND
min. 100m s
min. 100m s
min. 100m s
+ 24V (Pin 7)
GND (Pin 3)
co mp le te sig na l from d evice (Pin 2)
run sig na l PLC (Pin 5)
7.11.9.
Optional station lifting
With the optional station lifting it is possible to lift the entire station in an up position.
Before lifting a station the squeegee carriage has to be moved manually backwards,
until it touches the back Y-axis. With lifted stations the machine must not be
depressurized. Don’t disconnect the pneumatic line, switching off the machine is no
problem. Before reactivating a station (after lowering it) the position of the rear
squeegee stroke length adjustment must be checked to avoid a collision between
squeegee carriage and Y-axis.
7.11.10.
Dryer connector
The dryer connector is used to control external units like intermediate dryers or flock
units. When the machine detects a 24V signal at pin number 6 “Auto detect”, the dryer
is detected automatically. The dryer is started with a 24V signal on pin 5. The duration
of the drying process can be controlled internally through the control or externally
through the dryer. In case of external control, a 24V signal on pin 2 is required as a
ready message. The system detects the positive edge of the complete signal, no
continuous complete signal is allowed.
Pin assignment connector:
Pin 2: IN ready signal
Pin 3: GND
Pin 5: OUT run/start signal
Pin 6: Auto detect
Pin 7: +24 V