Section 6 - Storage
90-8M0053363
eng
NOVEMBER 2010
Page 121
14. Before launching the boat, pull up on the manual release valve. Verify that the green indicators are no longer extended.
a -
Green indicators
15. Open the seacock, if equipped, or unplug and reconnect the water inlet hose prior to operating the engine.
Boat out of the Water
NOTE: This procedure is written for the air pump that is attached to the engine. However, any air source can be used.
1. Place the boat on a lever surface to ensure complete draining of system.
2. Remove the air pump from the engine.
3. Ensure that the lever on top of the pump is flush with the handle (horizontal).
4. Install the air pump on the actuator fitting.
5. Pull lever on air pump (vertical) to lock pump on the fitting.
a -
Actuator fitting
b -
Green indicators
c -
Manual release valve
d -
Air pump
e -
Lever (locking)
a
6135
8293
b
d
e
a
c
Содержание Axius 350
Страница 4: ......
Страница 82: ...Section 3 On The Water Notes Page 74 90 8M0053363 eng NOVEMBER 2010 ...
Страница 122: ...Section 5 Maintenance Notes Page 114 90 8M0053363 eng NOVEMBER 2010 ...
Страница 138: ...Section 6 Storage Notes Page 130 90 8M0053363 eng NOVEMBER 2010 ...