LOF-3
Figure 6.2-12: Battery End Cap ..................................................................................... 6-12
Figure 6.2-13: Sediment Trap O-Ring Installation - Correct Placement is Critical ...... 6-14
Figure 6.2-14: Remove Drive Motor from Top Fixed Plate .......................................... 6-17
Figure 6.2-15: Remove Controller Housing from the Cross Channel ........................... 6-17
Figure 6.2-16: Remove Cross Channel From Frame ..................................................... 6-18
Figure 6.2-17: Gear Plate Assembly Under the Top Fixed Plate .................................. 6-18
Figure 6.2-18: Variseals
®
in Gear Ring Grooves .......................................................... 6-20
Figure 6.2-19: Installing Variseal
®
Thin Side Down .................................................... 6-21
Figure 6.2-20: Removing Bottom Fixed Plate .............................................................. 6-22
Figure 6.2-21: Fill Plug on Rotator Assembly .............................................................. 6-23
Figure 6.2-22: Performing Leak Test ............................................................................ 6-24
Figure A-1: WSD-10 Wet Sample Divider .................................................................... A-1
Figure A-2: WSD-10 Controls ....................................................................................... A-1
Figure A-3: Installing Sample Tray into Groove ........................................................... A-2
Figure A-4: Installing Sample Tray Front ..................................................................... A-3
Figure B-1: Trap with RBR Pressure and Temperature Sensor ..................................... B-1
Figure B-2: Trap Main Menu Configuration String with Pressure and Temperature ..... B-2
Figure B-3: Diagnostics with RBR Sensor Installed ..................................................... B-3
Figure B-4: Direct Communications with the RBR Sensor ............................................ B-4
Figure B-5: Option <P> Atmospheric Pressure Calculation ......................................... B-5
Figure B-6: Automatic Atmospheric Pressure Offset ..................................................... B-5
Figure B-7: Manual Atmospheric Pressure Calculation ................................................. B-6
Figure B-8: Change Sample Interval ............................................................................. B-7
Figure B-9: Diagnostics with RBR Sensor Installed ..................................................... B-7
Figure B-10: Offload/Display Data with Pressure and Temperature Readings .............. B-8
Figure B-11: Deployment Data Including Pressure and Temperature Sensor Data ....... B-9
Figure B-12: EEPROM Data Including Pressure and Temperature ............................. B-10
Figure C-1: Prompt for Interactive Commands ............................................................. C-1
Figure C-2: ‘ST’ Current Status ..................................................................................... C-2
Figure C-3: ‘RB’ Rotate Bottle ....................................................................................... C-2
Figure C-4: ‘VE’ View Event ........................................................................................ C-3
Figure C-5: ‘VE n’ View Specific Event ....................................................................... C-3
Figure C-6: ‘VE ALL’ View All Events ........................................................................ C-3
Figure C-7: ‘CE # Date/Time’ Change Event Number Scheduled Start ....................... C-4
Figure C-8: ‘DM’ Display Menu ................................................................................... C-4
Figure C-9: <3> Fill Containers ..................................................................................... C-5
Figure C-10: <5> Change Schedule (screen 1 of 2) ...................................................... C-6
Figure C-11: <5> Change Schedule (screen 2 of 2) ...................................................... C-7
Figure C-12: <5> Cannot Change Completed Event ..................................................... C-7
Figure C-13: <6> Resume Deployment ......................................................................... C-8
Figure C-14: <7> Offload Deployment Data (screen 1 of 2) ........................................ C-9
Содержание Mark 78H-21
Страница 1: ...Sediment Trap User Manual...
Страница 6: ...TOC 4...
Страница 28: ...1 18 Notes...
Страница 44: ...3 8 Notes...
Страница 74: ...5 8 Notes...
Страница 104: ...A 4 Notes...
Страница 128: ...A 4 Notes...
Страница 151: ...Appendix D 3 Test Cable Wiring Diagram Figure D 3 Test Cable Wiring Diagram...
Страница 160: ...Appendix E 8 Notes...
Страница 168: ...Appendix E 8 Notes...