6-18
4.
Remove the twelve (12) bolts that hold the funnel to the frame and the four (4)
bolts that hold the cross channel to the frame. Place the plastic inserts that hold the
bolts in a safe place so they are not lost.
Figure 6.2-16: Remove Cross Channel From Frame
Figure 6.2-17: Gear Plate Assembly Under the Top Fixed Plate
5.
While lifting the funnel, remove the cross channel and rotator assembly. Keep the
cross channel attached to the rotator assembly top fixed plate. Lower the funnel
back onto the frame and secure in a clean area.
Cross Channel Bolts
Bottom Fixed Plate
Retaining Bolt
Gear Ring
Содержание Mark 78H-21
Страница 1: ...Sediment Trap User Manual...
Страница 6: ...TOC 4...
Страница 28: ...1 18 Notes...
Страница 44: ...3 8 Notes...
Страница 74: ...5 8 Notes...
Страница 104: ...A 4 Notes...
Страница 128: ...A 4 Notes...
Страница 151: ...Appendix D 3 Test Cable Wiring Diagram Figure D 3 Test Cable Wiring Diagram...
Страница 160: ...Appendix E 8 Notes...
Страница 168: ...Appendix E 8 Notes...