Appendix C-6
<5> - Change Schedule
The preferred method for changing events is using the ‘CE’ command while in a deployment.
Selecting <5> Change Schedule displays the Schedule Menu. Typing ‘Y’ at the prompt displays
the Sample Schedule Menu.
05/15/2008 10:14:28 Sleeping . . .
ML12294-02 > DM
<05/15/2008 10:14:39> Deployment terminated by operator.
_______________________________________________________
McLane Research Laboratories, USA
ParFlux 21-Cup Sediment Trap
Version: PST-21E1.c S/N: ML12294-02
Main Menu
Thu May 15 10:14:39 2008
<1> Set Time <5> Change Schedule
<2> Diagnostics <6> Resume Deployment
<3> Fill Containers <7> Offload Data
<4> Sleep <8> Contacting McLane
Selection ? 5
8 events have already triggered.
These events will be preserved in the deployment schedule.
14 events which have not triggered will be erased.
Continue (Yes/No) [N] ? y
Change deployment schedule (Yes/No) [N] ? y
14 pending events removed from deployment schedule.
Enter the number of events to program (0 to 14) ? 14
SCHEDULE MENU
<1> Enter each event time
<2> Enter start date & interval
<3> Enter start date & end date
<M> Main Menu
Selection ? 2
Figure C-10: <5> Change Schedule (screen 1 of 2)
Type Y to change schedule
Number of completed sample events
Содержание Mark 78H-21
Страница 1: ...Sediment Trap User Manual...
Страница 6: ...TOC 4...
Страница 28: ...1 18 Notes...
Страница 44: ...3 8 Notes...
Страница 74: ...5 8 Notes...
Страница 104: ...A 4 Notes...
Страница 128: ...A 4 Notes...
Страница 151: ...Appendix D 3 Test Cable Wiring Diagram Figure D 3 Test Cable Wiring Diagram...
Страница 160: ...Appendix E 8 Notes...
Страница 168: ...Appendix E 8 Notes...