Appendix C-10
As shown in Figure C-15, deployment data for Events 01-09 displays because only these events
have been completed.
DEPLOYMENT DATA
_______________
Event 01
Scheduled start time: 05/15/2008 10:00:00
Event start time: 05/15/2008 10:00:00
Event stop time: 05/15/2008 10:00:25
Aligned Battery Temperature
Start: Y 23.7 24 øC
Stop: Y 23.8 24 øC
Event 02
Scheduled start time: 05/15/2008 10:08:16
Event start time: 05/15/2008 10:08:16
Event stop time: 05/15/2008 10:08:41
Aligned Battery Temperature
Start: Y 23.8 25 øC
Stop: Y
23.8 25
øC
…
Event 09
Scheduled start time: 05/15/2008 10:30:00
Event start time: 05/15/2008 10:30:00
Event stop time: 05/15/2008 10:30:25
Aligned Battery Temperature
Start: Y 23.7 26 øC
Stop: Y 23.7 27 øC
Schedule was not completed.
System recovered early.
End of instrument data file.
Terminate file logging operation now
and press any key to continue.
Figure C-15: <7> Offload Deployment Data (screen 2 of 2)
To redeploy the Sediment Trap, the electronics must be reset and/or the power cycled by
disconnecting the battery pack.
Display shortened to save
space
Содержание Mark 78H-21
Страница 1: ...Sediment Trap User Manual...
Страница 6: ...TOC 4...
Страница 28: ...1 18 Notes...
Страница 44: ...3 8 Notes...
Страница 74: ...5 8 Notes...
Страница 104: ...A 4 Notes...
Страница 128: ...A 4 Notes...
Страница 151: ...Appendix D 3 Test Cable Wiring Diagram Figure D 3 Test Cable Wiring Diagram...
Страница 160: ...Appendix E 8 Notes...
Страница 168: ...Appendix E 8 Notes...