Engine General Information and Diagnosis: Bi-Fuel LPG model 1A-66
Inspection of ECM and Its Circuit
AENAR90A1104052
Voltage Check
NOTE
• As each terminal voltage is affected by battery voltage, confirm that it is 11 V or more when ignition
switch is turned to ON position.
• Terminal No. with asterisk (*) cannot be measured with voltmeter because it is pulse signal. Use
oscilloscope for its check if necessary.
• Before performing this check, be sure to read “Precaution for ECM and LPG Control Module Circuits
Inspection”: Bi-Fuel LPG model.
• For identification of each cylinder, refer to “Cylinder Identification Description”: .
31
32
33
34
35
36
37
38
39
40
41
42
43
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
30
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
[A]
C01
E01
A
29 28
I9R90A112029-01
[A]: ECM connector (View: A)
Terminal No.
Wire color
Circuit
Normal voltage
Condition
C01-1*
BRN
Fuel injector No.2
control circuit
10 – 14 V
Ignition switch: ON
0 – 1 V
↑
↓
10 – 14 V
/
Engine: Idle speed after
warming up
C01-2*
BRN/YEL
Fuel injector No.1
control circuit
10 – 14 V
Ignition switch: ON
0 – 1 V
↑
↓
10 – 14 V
/
Engine: Idle speed after
warming up
C01-3
—
—
—
—
C01-4
—
—
—
—
C01-5
—
—
—
—
C01-6
—
—
—
—
C01-7
—
—
—
—
C01-8
BLK
ECM ground circuit
Below 0.3 V
Ignition switch: ON
C01-9*
BLU
Knock sensor signal
circuit
2 – 3 V
Engine: Running at 4,000
rpm after warming up
C01-10
GRN
Knock sensor ground
circuit
Below 0.3 V
Ignition switch: ON
C01-11
GRY/RED
TP sensor power
supply circuit
4.5 – 5.5 V
Ignition switch: ON
C01-12*
BLU/BLK
EVAP canister purge
valve control circuit
0 – 1 V
↑
↓
10 – 14 V
EVAP canister purge valve:
10% open (using active test
of SUZUKI scan tool)
C01-13*
YEL/RED
HO2S heater control
circuit
0 – 1 V
↑
↓
10 – 14 V
Engine: Idle speed after
warming up
Содержание Wagon R
Страница 2: ......
Страница 32: ...0B 5 Maintenance and Lubrication ...
Страница 184: ...1J 3 Charging System ...