
5-26
2.8.2 REGULAR MAINTENANCE
Preform periodic inspections every three to six months according to the usage frequency.
DANGER
Regulation
- Perform the following steps before starting the inspection.
(1) Cutoff “OFF” the input power.
(2) Check that the charge lamp is off after 10 minutes has elapsed.
(3) Use a tester that is capable of measuring DC high voltage (more than DC 800V), and check
that the DC main circuit voltage (between PA–PC) is under 45V.
If this step is not performed before inspection, it may lead to an electrical shock.
Prohibited
- Parts must not be replaced.
May result in electrical shock, fire, or injury. Parts replacement must be ordered to the vendor.
■
Places of inspection
1. Whether there are any loose screws on the wiring terminal. Retorque with a driver.
2. Whether there are any faulty standoffs at the wiring terminal standoff positions. Visually inspect for traces of
heat at the places of standoffs.
3. Whether there is any damage on the wiring and cables. Perform visual inspections.
4. Clean off any debris and dust. Remove the debris and dust with an electrical vacuum cleaner. Pay attention to
the ventilation ports and printed boards when cleaning. Unpredicted accidents may occur if debris or dust
accumulates. Keep clean.
5. The large capacity electrolytic capacitors used in the inverter tends to decay if left for a long period without any
electricity flowing.
If not being used for a long period, allow electricity to flow for at least five hours once in two years so that the
large capacity electrolytic capacitors recover their characteristics. Check the inverter operation at the same
time. It is recommended that commercial power shall not be directly connected to the inverter, and equipments
such as thruidakus are used, and the input voltage be raised gradually.
6. When performing insulation tests, use 500V mega, and only perform with the main circuit terminal block as the
target. Never perform insulation tests on control terminals or print boards other than the main circuit. When
performing insulation tests on the motor, disconnect the output terminal U, V, W and perform only on the motor.
When performing insulation tests on surrounding circuits other than the motor, remove all of the wires
connected to the inverter, so that no test voltage flows to the inverter.
(Note) Always remove the wires connected to the main circuit terminal block, and perform on only the inverter
itself.
7. Do not perform pressure tests since it may damage the internal parts.
8. Voltage and temperature check
Recommended amperometer:
Input side
→
moving iron type amperometer (
)
Output side
→
Rectifier type amperometer (
)
It is easier to identify abnormalities if the temperature surrounding the inverter is always measured during the
startup, operation, and stop process.
Содержание MK0003
Страница 2: ......
Страница 8: ...0 6...
Страница 12: ...1 4 2 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Страница 17: ...1 9 4 WORKING RADIUS LIFTING HEIGHT...
Страница 18: ...1 10 Working range diagram Outrigger extended to maximum Main boom 1 section...
Страница 19: ...1 11 Working range diagram Outrigger extended to maximum Main boom 2 sections...
Страница 20: ...1 12 Working range diagram Outrigger extended to maximum Main boom 2 5 sections...
Страница 21: ...1 13 Working range diagram Outrigger extended to maximum Main boom 3 sections...
Страница 22: ...1 14 Working range diagram Outrigger extended to minimum Main boom 1 section...
Страница 23: ...1 15 Working range diagram Outrigger extended to minimum Main boom 2 sections...
Страница 24: ...1 16 Working range diagram Outrigger extended to minimum Main boom 2 5 sections...
Страница 25: ...1 17 Working range diagram Outrigger extended to minimum Main boom 3 sections...
Страница 26: ...1 18 5 RATED TOTAL LOAD CHART...
Страница 32: ...2 4...
Страница 33: ...2 5 1 HYDRAULIC CIRCUIT DIAGRAM 200 1176600...
Страница 34: ...2 6...
Страница 35: ...2 7 2 HYDRAULIC PIPING DIAGRAM 2 1 CRANE ROTATING PART 200 1171800...
Страница 41: ...2 13 2 2 CONTROL LINE A...
Страница 43: ...2 15 2 3CONTROL LINE B Perform spiral winding on the entire perimeter of the hose of this part...
Страница 45: ...2 17 2 4 TRAVEL LINE...
Страница 47: ...2 19 2 5 OUTRIGGER LINE...
Страница 49: ...2 21 2 6 PT LINE 102 1152000 4...
Страница 69: ...2 41...
Страница 70: ...2 42...
Страница 71: ...2 43...
Страница 76: ...2 48 4 8 ENGINE ACCESSORIES 102 1149200...
Страница 90: ...2 62 7 2 INTERNAL STRUCTURE...
Страница 120: ...2 92 Part B Writing method for wire number Two places...
Страница 123: ...2 95 Figure 1 Index point Figure 2 Connection diagram...
Страница 166: ...2 138 15 4 APPEARANCE OF OUTRIGGER ON REAR LEFT SIDE 200 2167300...
Страница 173: ...2 145 17 ELECTRIC CIRCUIT DIAGRAM 200 1176500 01...
Страница 174: ...2 146 18 ELECTRIC SYSTEM 18 1 1 WIRE HARNESS OF MACHINE BODY 1 200 1172200 1...
Страница 176: ...2 148 18 1 2 WIRE HARNESS OF MACHINE BODY 2 200 1172200 2...
Страница 179: ...2 151 19 CONTROL ASSEMBLY 19 1 CONTROLLER 1 TTC60 Pin arrangement...
Страница 180: ...2 152 TTC60 I O...
Страница 181: ...2 153 2 TTC36X Pin arrangement...
Страница 182: ...2 154 TTC36X lower part I O...
Страница 209: ...2 181 19 2 5 LIST OF CONTROLLER INPUT MONITORING...
Страница 210: ...2 182 19 2 6 LIST OF CONTROLLER ANALOG INPUT OUTPUT MONITORING...
Страница 245: ...3 9 1 2 3 ANGLE METER 360 S200M3297000...
Страница 274: ...3 38...
Страница 293: ...4 19 8 SERVICE LOCATIONS...
Страница 294: ...4 20...
Страница 296: ...5 2 1 ELECTRICAL MOTOR UNIT ASSEMBLY Unit weight 180 kg...
Страница 299: ...5 5 1 1 POWER UNIT 1 Power unit cover 2 Electric motor 3 Coupling 4 Hydraulic pump Power supply box...
Страница 323: ...5 29 3 POWER SUPPLY BOX 1 Power supply box 2 Power supply box door 3 Door handle 4 Terminal block 5 Cable inserting hole...
Страница 324: ...5 30...
Страница 325: ...5 31 4 ELECTRICAL DIAGRAM S200M3122000 01...
Страница 326: ...5 32 S200M3122000 02...
Страница 336: ...6 8 1 3 2 INTERNAL STRUCTURE OF WINCH MOTOR...
Страница 345: ...6 17 4 WORKING RADIUS LIFTING HEIGHT OF ONE FALL WINCH...
Страница 348: ......