
2-78
[4] Actuation of magnetic switching valve
(derricking, winching, extension/contraction and slewing)
1. When the solenoid is not excited
Spool (1) is maintained in the neutral position by return spring (2).
Pilot valve (3) is pushed up toward the solenoid side by the force of pilot valve spring (4).
In this state, while the pilot path is closed by pilot valve (3), pilot chambers (a) and (b) are connected together by
way of the drain path and socket (5). Consequently, the pressure of pilot chamber (a) becomes equal to that of
pilot chamber (b) (drain pressure), and no force that can move spool (1) is generated.
Further, since spool (1) employs the all port block type, in the neutral spool position, between parallel path (c),
actuator paths (d1) and (d2) as well as between actuator paths (d1) and (d2) and tank path (f) are closed.
Accordingly, since every path that leads to actuators is shut off, the actuators are stopped.
On the other hand, when every one of other switching valves is in the neutral position, the oil supplied from pump
passes the central bypass path (e) of each switching valve, and returns to the tank after passing the tank path (f)
via the U-turn cover.
Actuator
From pump
Pilot pressure
(via reducing valve)
Oil path when pilot is in neutral position
To drain path
1. Spool
2. Return spring
3. Pilot valve
4. Pilot valve spring
5. Socket
Содержание MK0003
Страница 2: ......
Страница 8: ...0 6...
Страница 12: ...1 4 2 DIMENSIONAL DRAWING OF OUTRIGGER WIDTH...
Страница 17: ...1 9 4 WORKING RADIUS LIFTING HEIGHT...
Страница 18: ...1 10 Working range diagram Outrigger extended to maximum Main boom 1 section...
Страница 19: ...1 11 Working range diagram Outrigger extended to maximum Main boom 2 sections...
Страница 20: ...1 12 Working range diagram Outrigger extended to maximum Main boom 2 5 sections...
Страница 21: ...1 13 Working range diagram Outrigger extended to maximum Main boom 3 sections...
Страница 22: ...1 14 Working range diagram Outrigger extended to minimum Main boom 1 section...
Страница 23: ...1 15 Working range diagram Outrigger extended to minimum Main boom 2 sections...
Страница 24: ...1 16 Working range diagram Outrigger extended to minimum Main boom 2 5 sections...
Страница 25: ...1 17 Working range diagram Outrigger extended to minimum Main boom 3 sections...
Страница 26: ...1 18 5 RATED TOTAL LOAD CHART...
Страница 32: ...2 4...
Страница 33: ...2 5 1 HYDRAULIC CIRCUIT DIAGRAM 200 1176600...
Страница 34: ...2 6...
Страница 35: ...2 7 2 HYDRAULIC PIPING DIAGRAM 2 1 CRANE ROTATING PART 200 1171800...
Страница 41: ...2 13 2 2 CONTROL LINE A...
Страница 43: ...2 15 2 3CONTROL LINE B Perform spiral winding on the entire perimeter of the hose of this part...
Страница 45: ...2 17 2 4 TRAVEL LINE...
Страница 47: ...2 19 2 5 OUTRIGGER LINE...
Страница 49: ...2 21 2 6 PT LINE 102 1152000 4...
Страница 69: ...2 41...
Страница 70: ...2 42...
Страница 71: ...2 43...
Страница 76: ...2 48 4 8 ENGINE ACCESSORIES 102 1149200...
Страница 90: ...2 62 7 2 INTERNAL STRUCTURE...
Страница 120: ...2 92 Part B Writing method for wire number Two places...
Страница 123: ...2 95 Figure 1 Index point Figure 2 Connection diagram...
Страница 166: ...2 138 15 4 APPEARANCE OF OUTRIGGER ON REAR LEFT SIDE 200 2167300...
Страница 173: ...2 145 17 ELECTRIC CIRCUIT DIAGRAM 200 1176500 01...
Страница 174: ...2 146 18 ELECTRIC SYSTEM 18 1 1 WIRE HARNESS OF MACHINE BODY 1 200 1172200 1...
Страница 176: ...2 148 18 1 2 WIRE HARNESS OF MACHINE BODY 2 200 1172200 2...
Страница 179: ...2 151 19 CONTROL ASSEMBLY 19 1 CONTROLLER 1 TTC60 Pin arrangement...
Страница 180: ...2 152 TTC60 I O...
Страница 181: ...2 153 2 TTC36X Pin arrangement...
Страница 182: ...2 154 TTC36X lower part I O...
Страница 209: ...2 181 19 2 5 LIST OF CONTROLLER INPUT MONITORING...
Страница 210: ...2 182 19 2 6 LIST OF CONTROLLER ANALOG INPUT OUTPUT MONITORING...
Страница 245: ...3 9 1 2 3 ANGLE METER 360 S200M3297000...
Страница 274: ...3 38...
Страница 293: ...4 19 8 SERVICE LOCATIONS...
Страница 294: ...4 20...
Страница 296: ...5 2 1 ELECTRICAL MOTOR UNIT ASSEMBLY Unit weight 180 kg...
Страница 299: ...5 5 1 1 POWER UNIT 1 Power unit cover 2 Electric motor 3 Coupling 4 Hydraulic pump Power supply box...
Страница 323: ...5 29 3 POWER SUPPLY BOX 1 Power supply box 2 Power supply box door 3 Door handle 4 Terminal block 5 Cable inserting hole...
Страница 324: ...5 30...
Страница 325: ...5 31 4 ELECTRICAL DIAGRAM S200M3122000 01...
Страница 326: ...5 32 S200M3122000 02...
Страница 336: ...6 8 1 3 2 INTERNAL STRUCTURE OF WINCH MOTOR...
Страница 345: ...6 17 4 WORKING RADIUS LIFTING HEIGHT OF ONE FALL WINCH...
Страница 348: ......