Chapter 3 Installation and Test Operation
3-4
2) Pnet Connector structure and wiring method
(1) Input Line: green line is connected to A1, red line is connected to B1
(2) Output line: green line is connected to A2, red line is connected to B2
(3) Connect shield to clamp of shield
(4) In case of installing the connector at terminal, install the cable at A1, B1
<Connector structure>
<Cable structure>
<Cable wiring method>
Содержание 47200001
Страница 15: ...Table of Content 14 ...
Страница 51: ...Chapter 5 Communication Program 5 16 ...
Страница 55: ...Chapter 6 SyCon Setting 6 4 Select Yes 5 Configuration Setup Select Next ...
Страница 57: ...Chapter 6 SyCon Setting 6 6 3 Setup complete 6 Installed contents 1 Installed file ...
Страница 64: ...Chapter 6 SyCon Setting 6 13 3 Edit 4 Master Configuration Select Settings Master Configuration on menu ...
Страница 73: ...Chapter 6 SyCon Setting 6 22 ...
Страница 99: ...Chapter 7 N Configurator Setting 7 26 ...
Страница 115: ...Chapter 8 High speed Link 8 16 ...
Страница 127: ...Chapter 9 P2P 9 12 ...
Страница 154: ...Chapter 10 Program Example 10 27 Figure 10 2 24 Link Enable High speed link P2P ...
Страница 173: ...Chapter 10 Program Example 10 46 ...
Страница 183: ...Chapter 11 Troubleshooting 11 10 11 4 3 XG5000 abnormal connection ...
Страница 185: ...Chapter 11 Troubleshooting 11 12 ...
Страница 197: ...Appendix A 8 A 3 Dimensions XGL PMEA B C have same dimensions Unit mm ...
Страница 199: ...Warranty and Environment Policy 2 ...