Chapter 3 Installation and Test Operation
3-1
Chapter 3 Installation and Test Operation
3.1 Precautions for Installation
3.1.1 Precautions for Installation
For system configuration through Pnet I/F module, carefully make sure of the following items prior to
installation.
1) Check the basic factors necessary for system configuration to select an appropriate communication
module.
2) Select the exclusive Pnet cable to be used for this communication module.
3) Before the communication module is installed, check for any foreign material on the base connector the
module will be installed on and any damage on the connector pin of the module.
4) All the communication modules can be installed on the basic base ~ the expansion base. For the
number of available expansion base by CPU, refer to the following table.
Item
XGK
XGI
XGR
XGK-
CPUH
/CPUU
XGK-
CPUA
/CPUS
/CPUSN
XGK-
CPUHN
/CPUUN
XGK-
CPUE
XGI-
CPUUN
XGI-
CPUU
XGI-
CPUH
XGI-
CPUS
XGI-
CPUE
XGR-
CPUH/T,
CPUH/F,
CPUH/S
Number of
available
expansion base
(max.)
(Available to
equip
communication
module)
7
3
7
1
7
3
1
31
5) For installation of the module, exactly insert the protuberant part at the bottom of the module with the
communication cable disconnected into the base groove and then apply enough strength until its top is
locked up with the locking device of the base. If the lock is not applied, it may cause an error on the
interface with CPU.
Содержание 47200001
Страница 15: ...Table of Content 14 ...
Страница 51: ...Chapter 5 Communication Program 5 16 ...
Страница 55: ...Chapter 6 SyCon Setting 6 4 Select Yes 5 Configuration Setup Select Next ...
Страница 57: ...Chapter 6 SyCon Setting 6 6 3 Setup complete 6 Installed contents 1 Installed file ...
Страница 64: ...Chapter 6 SyCon Setting 6 13 3 Edit 4 Master Configuration Select Settings Master Configuration on menu ...
Страница 73: ...Chapter 6 SyCon Setting 6 22 ...
Страница 99: ...Chapter 7 N Configurator Setting 7 26 ...
Страница 115: ...Chapter 8 High speed Link 8 16 ...
Страница 127: ...Chapter 9 P2P 9 12 ...
Страница 154: ...Chapter 10 Program Example 10 27 Figure 10 2 24 Link Enable High speed link P2P ...
Страница 173: ...Chapter 10 Program Example 10 46 ...
Страница 183: ...Chapter 11 Troubleshooting 11 10 11 4 3 XG5000 abnormal connection ...
Страница 185: ...Chapter 11 Troubleshooting 11 12 ...
Страница 197: ...Appendix A 8 A 3 Dimensions XGL PMEA B C have same dimensions Unit mm ...
Страница 199: ...Warranty and Environment Policy 2 ...