Chapter 9 P2P
9-6
5) P2P project
Select XG5000
View P2P
[Figure 9.4.3] Initial screen of P2P Setting
6) Communication module and Communication period setting
If right-click the P2P
“Add Item”
“P2P Communication”, screen of Communication module settings
and Communication period settings is opened. In this screen, communication module, communication
period and output data in case of emergency can be specified.
[Figure 9.4.4] P2P setting window
Classification
Description
Communication
module settings
Module type
Select Pnet I/F module
Base No.
Setting of base position installed
Range of setting: 0~7 (varying depending on the CPU module)
Slot No.
Setting of slot position installed
Range of setting: 0~11
P2P index
Setting of P2P index number
Range of setting: 1~8
[Table 9.4.3] Communication module setting
Содержание 47200001
Страница 15: ...Table of Content 14 ...
Страница 51: ...Chapter 5 Communication Program 5 16 ...
Страница 55: ...Chapter 6 SyCon Setting 6 4 Select Yes 5 Configuration Setup Select Next ...
Страница 57: ...Chapter 6 SyCon Setting 6 6 3 Setup complete 6 Installed contents 1 Installed file ...
Страница 64: ...Chapter 6 SyCon Setting 6 13 3 Edit 4 Master Configuration Select Settings Master Configuration on menu ...
Страница 73: ...Chapter 6 SyCon Setting 6 22 ...
Страница 99: ...Chapter 7 N Configurator Setting 7 26 ...
Страница 115: ...Chapter 8 High speed Link 8 16 ...
Страница 127: ...Chapter 9 P2P 9 12 ...
Страница 154: ...Chapter 10 Program Example 10 27 Figure 10 2 24 Link Enable High speed link P2P ...
Страница 173: ...Chapter 10 Program Example 10 46 ...
Страница 183: ...Chapter 11 Troubleshooting 11 10 11 4 3 XG5000 abnormal connection ...
Страница 185: ...Chapter 11 Troubleshooting 11 12 ...
Страница 197: ...Appendix A 8 A 3 Dimensions XGL PMEA B C have same dimensions Unit mm ...
Страница 199: ...Warranty and Environment Policy 2 ...