Chapter 10 Program Example
10-26
After N Configurator setting file is uploaded, setting information is displayed in block window as shown
below. Double click the applicable index to set the address. Set %MW200 for station3, %MW0 for station 4
and %MW3000 for area to read, %MW3011 for area to save of station 6.
[Table 10.2.22] High-speed link block setting
After finish the setting, setting information is downloaded in PLC. Select [Online]
– [Write] (standard settings,
High-speed link, P2P). Here, Check High-speed link to download and click
‘OK’.
[Table 10.2.23] Write
After Write is finished, the operation is by applicable high-speed link enabled. Select the [Online]-
[Communication module setting]-[Enable Link] (High-speed, P2P). And Link Enable window is displayed as
shown below. Select the applicable High-speed link number and then select
‘Write’ to set.
Содержание 47200001
Страница 15: ...Table of Content 14 ...
Страница 51: ...Chapter 5 Communication Program 5 16 ...
Страница 55: ...Chapter 6 SyCon Setting 6 4 Select Yes 5 Configuration Setup Select Next ...
Страница 57: ...Chapter 6 SyCon Setting 6 6 3 Setup complete 6 Installed contents 1 Installed file ...
Страница 64: ...Chapter 6 SyCon Setting 6 13 3 Edit 4 Master Configuration Select Settings Master Configuration on menu ...
Страница 73: ...Chapter 6 SyCon Setting 6 22 ...
Страница 99: ...Chapter 7 N Configurator Setting 7 26 ...
Страница 115: ...Chapter 8 High speed Link 8 16 ...
Страница 127: ...Chapter 9 P2P 9 12 ...
Страница 154: ...Chapter 10 Program Example 10 27 Figure 10 2 24 Link Enable High speed link P2P ...
Страница 173: ...Chapter 10 Program Example 10 46 ...
Страница 183: ...Chapter 11 Troubleshooting 11 10 11 4 3 XG5000 abnormal connection ...
Страница 185: ...Chapter 11 Troubleshooting 11 12 ...
Страница 197: ...Appendix A 8 A 3 Dimensions XGL PMEA B C have same dimensions Unit mm ...
Страница 199: ...Warranty and Environment Policy 2 ...