![Lincoln IMPINGER 1100 Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/lincoln/impinger-1100/impinger-1100_service-manual_1917751045.webp)
Impinger II –1100 Series Service Manual - Domestic
45
PROCEDURE FOR USE OF TIME/TEMP SIMULATOR
NOTE: For displays with Thermocouple, simulator will not work
.
This is a test device used to check the Time/Temp. Display
1. Procedure for use:
Check incoming power to display at following terminals.
a) Terminal 1 to 3 should have approximately 12.5 to 15 VAC.
b) Terminal 2 to 1 should be 1/2 of the reading from 1 to 3.
c) Terminal 2 to 3 should also be 1/2 of the reading from 1 to 3.
2.
Identify Display type:
a) Type 1 has 6 dip switches and display case is 5 1/8" wide (12.8cm).
b) Type 2 has 6 dip switches and display case is 5 5/8" wide (14 cm).
c) Type 3 has 10 dip switches.
3.
Set Dip Switches as follows:
1
2
3
4
5
6
7
8
9
10
TYPE 1
OFF
OFF OFF ON
OFF OFF
TYPE 2
OFF
OFF OFF OFF OFF OFF
TYPE 3
OFF
OFF OFF OFF OFF OFF OFF ON OFF ON
4. WITH POWER OFF: Remove all leads from T/T display except power input on 1,2 and 3. Install simulator to
terminals 4, 7, 9, 10.
NOTE
: When on 50 Hz power dip switch number 2 must be on.
5.
WITH POWER ON
: Turn time and temperature adjustment pot. fully counter clockwise.
Display should read (wait 15 seconds after turning):
SPEED
TEMPERATURE
TYPE 1
9:30 ± 10 SEC
475° ± 10°F
TYPE 2
9:20 ± 10 SEC.
HHH
TYPE 3
9:35 ± 10 SEC.
635° ± 10°F
6. Turn time and temperature pot. fully clockwise.
Display should read (wait 15 seconds after turning):
SPEED
TEMPERATURE
TYPE 1
10:20 ± 10 SEC
615° ± 10°F
TYPE 2
10:10 ± 10 SEC
475° ± 10°F
TYPE 3
. 10:20 ± 10 SEC
475° ± 10°F
7. For performance test, turn time pot. to 10:00 and temp. adjustment pot. To 540° ± 10°F.
a) Time reading on display of 10:00 should not fluctuate more than ± 5 seconds.
b) Temperature on display reading should not fluctuate.
SWITCH, ON/OFF
1. Shut off power at main breaker.
2. Remove conveyor.
3. Remove front control compartment cover.
4. Remove wires from switch and mark for reassembly.
5. Depress spring clips on the side of switch and push out.
6. Reinstall in reverse order.
TRANSFORMER, STEP DOWN/120 VAC
1. Shut off power at main breaker.
2. Remove Conveyor.
3. Remove control compartment covers.
4. Remove wires from transformer and mark for reassembly.
5. Remove 4 mounting screws from transformer base and replace.
6. Reassemble in reverse order.
Содержание IMPINGER 1100
Страница 8: ...Impinger II 1100 Series Service Manual Domestic 8 SCHEMATIC 1100 1101 ...
Страница 9: ...Impinger II 1100 Series Service Manual Domestic 9 SCHEMATIC 1102 1103 ...
Страница 10: ...Impinger II 1100 Series Service Manual Domestic 10 SCHEMATIC 1116 1117 S N 2011383 BELOW ...
Страница 11: ...Impinger II 1100 Series Service Manual Domestic 11 SCHEMATIC 1116 1117 S N 2011384 ABOVE ...
Страница 13: ...Impinger II 1100 Series Service Manual Domestic 13 SCHEMATIC 1130 1131 S N 2011384 ABOVE ...
Страница 14: ...Impinger II 1100 Series Service Manual Domestic 14 SCHEMATIC 1160 1161 S N 2011978 ABOVE ...
Страница 16: ...Impinger II 1100 Series Service Manual Domestic 16 SCHEMATIC 1132 1133 S N 2011384 ABOVE ...
Страница 17: ...Impinger II 1100 Series Service Manual Domestic 17 SCHEMATIC 1162 1163 S N 2011978 ABOVE ...
Страница 51: ...Impinger II 1100 Series Service Manual Domestic 51 BLOW UP GENERAL 1100 SERIES ...
Страница 55: ...Impinger II 1100 Series Service Manual Domestic 55 BLOW UP CONTROL COMPARTMENT FRONT 1116 1117 ...
Страница 65: ...Impinger II 1100 Series Service Manual Domestic 65 BLOW UP OVEN BACK ASSEMBLY 1100 SERIES ...
Страница 67: ...Impinger II 1100 Series Service Manual Domestic 67 BLOW UP GEARMOTOR ASSEMBLY 1100 SERIES ...
Страница 69: ...Impinger II 1100 Series Service Manual Domestic 69 BLOW UP CONVEYOR DOOR 1100 SERIES ...
Страница 71: ...Impinger II 1100 Series Service Manual Domestic 71 This page intentionally left blank ...
Страница 72: ...Impinger II 1100 Series Service Manual Domestic 72 ...