![LI-COR LI-7500 Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/li-cor/li-7500/li-7500_instruction-manual_1906655030.webp)
Setup and Operation
3-1
Setup and Operation
Installing the LI-7500
Mounting the Control Box
Brackets are included that can be used to mount the control box using bolts or U-clamps to
secure the box to a tripod or other post. There are holes in the four corners of the box, as well,
that can be used to attach the box directly to a flat surface, if desired.
The mounting brackets are designed to accomodate a square or circular mounting post of up to
1 1/4" in width (diameter). Use a 3/16" hex key to attach the mounting brackets to the control
box. The U-bolt can then be inserted through the holes in the mounting bracket, and tightened
around the post, as shown in Figure 3-1.
Содержание LI-7500
Страница 1: ...Analyzer Environmental Division Instruction Manual 7500...
Страница 2: ...Open Path CO2 H2O Analyzer Instruction Manual...
Страница 41: ...Section 3 3 12 Setup and Operation...
Страница 43: ...Section 3 3 14 Setup and Operation...
Страница 46: ...Section 3 Setup and Operation 3 17...
Страница 50: ...Section 3 Setup and Operation 3 21 Inputs Page Temperature Pressure and Auxiliary Inputs...
Страница 56: ...Section 3 Setup and Operation 3 27...
Страница 58: ...Section 3 Setup and Operation 3 29...
Страница 67: ...Section 3 3 38 Setup and Operation...
Страница 70: ...Section 3 Setup and Operation 3 41...
Страница 107: ...Section 6 6 6 Troubleshooting...