Troubleshooting Guide
- 131 -
Copyright ©2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
Location of 4way valve connector on
Main PCB(marked as 4way,CN09)
** Confirm the 4way valve coil is inserted to the end
* Measure the resistance of 4way valve
**** Check the output voltage of terminal socket
during heating operation
*** When power is supplied in order as follow
(Slave
→
Mater)
ODU information is displayed one after the other at main PCB 7-segment
1. Model ID
2. Total Capacity
→
Displayed with HP
3. ODU Type
→
HEAT PUMP : 2, Sync : 3
4. Normal mode : 25
5. Refrigerant
→
3Ø 208/230V : 140, 3Ø 460V : 160
***** Checking method for outdoor unit of 3unit system
( Slave)
➀
Close all the SVC valves of high / low pressure common pipe
➁
Operate system
➂
Check the difference of high and low pressure with LGMV for each unit (Master, Slave)
➃
If there is a unit in which the difference is not increased then the 4way valve of that unit is defective
Содержание ARUN Series
Страница 134: ...P NO MFL50459503 MAY 2008 ...