54
ENGLISH
Using the Program
Item
Description
Control
Configuration
Area
Configure Peak Controls.
y
Operation Status
-
Can be configured in
[Environment > Advance Setting]
.
-
Priority
: Controls based on group priority
-
Outdoor unit capacity control
: Controls based on outdoor unit
capacity limit.
(Operation Status - Priority Control selected)
y
Operation
-
[Run]
Button: Operates the device.
-
[Stop]
Button: Stops the operation of the device.
y
ShiftTime(Min.)
: The cycle by which the operation switches over.
y
Target ratio(%)
: Displays the target operation rate.
y
Current Running(%)
: Displays the current rate.
(Operation Status - Outdoor unit capacity control selected)
y
Operation
-
[Run]
Button: Operates the device.
-
[Stop]
Button: Stops the operation of the device.
y
Target ratio(%)
: Displays the target operation rate.
Содержание ACP BACnet
Страница 2: ......
Страница 4: ...ii ENGLISH Explanatory Notes ...
Страница 6: ...ENGLISH MEMO ...
Страница 10: ...ENGLISH MEMO ...
Страница 12: ...ENGLISH MEMO ...
Страница 22: ...ENGLISH MEMO ...
Страница 135: ...123 ENGLISH Installing ACP BACnet E may be changed ...
Страница 144: ...ENGLISH MEMO ...
Страница 156: ...144 ENGLISH Functional Specifications ACP BACnet ...
Страница 220: ......