Commissioning and configuration
Leuze electronic
LES 36
62
TNT
35/7-2
4
V
8.3
Commissioning
For the commissioning and integration of the sensor in the process control the following
steps are necessary:
1.
LES configuration - see Chapter 9.
2.
Programming process control - see Chapter 10 and Chapter 11.
or
3.
Connect analog output accordingly - see Chapter 6.3.5
4.
Connect switching inputs and outputs accordingly - see Chapter 6.3.3.
5.
When connecting in the Ethernet process controls, the IP configuration of the LES is
to be adjusted so that the LES can communicate with the process control.
The values corresponding to the following screenshot are preset in the LES at the fac-
tory. If you would like to set different values, you must change the values via the display
of the LES in menu item
Ethernet
(see "Menu description" on page 55). You can test
the changed values by entering them in the
Configuration
area in LESsoft and then
clicking the
Check Connectivity
button.
6.
Connect LES to the process control. This can be performed for all LES via the Ethernet
interface or, depending on model, via the analog outputs or the PROFIBUS.
7.
Establish connections for activation, triggering and cascading, if necessary.
Notice on connecting multiple Light section sensors via Ethernet
If several sensors are to be activated, all sensors as well as the control must receive
different
IP addresses
on the same subnet. For all sensors
different ports
must be configured in
the
Sensor
area as well as in the
Client/PC
area.