Figure 74. Front operator panel (3.5-inch drive model) installation
After you finish
1. Connect the front operator panel cables to the system board. See
“Front panel cable routing” on page
2. Install the top cover. See
“Install the top cover” on page 134
3. Complete the parts replacement. See
“Complete the parts replacement” on page 140
Heat sink replacement
Follow this procedure to remove and install the heat sink.
Remove the heat sink
Use this information to remove the heat sink. This procedure must be executed by a trained technician.
Attention:
• Read the following section(s) to ensure that you work safely.
–
–
“Installation Guidelines” on page 51
• Power off the server and peripheral devices and disconnect the power cords and all external cables. See
“Power off the server” on page 11
.
• If the server is installed in a rack, remove the server from the rack.
Watch the procedure
A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
Procedure
Step 1. Remove the top cover. See
“Remove the top cover” on page 132
Step 2. Loosen screw 1 and 2:
a. Partially loosen screw 1.
b. Fully loosen screw 2.
c. Fully loosen screw 1.
86
ThinkSystem SR250 V2 Maintenance Manual
Содержание 7D7Q
Страница 1: ...ThinkSystem SR250 V2 Maintenance Manual Machine Types 7D7Q and 7D7R ...
Страница 8: ...vi ThinkSystem SR250 V2 Maintenance Manual ...
Страница 20: ...12 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 35: ...2 5 inch drive model Figure 26 Server components 2 5 inch drive model Chapter 2 Server components 27 ...
Страница 42: ...34 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 176: ...168 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 180: ...172 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 183: ......
Страница 184: ......