Figure 123. VGA cable installation
a.
Insert the VGA cable into the front I/O assembly.
b.
Install and fasten two screws to secure the VGA cable.
After you finish
1. Install the front operator panel (2.5-inch drive model). See
“Install the front operator panel (2.5-inch drive
.
2. Install the top cover onto the server. See
“Install the top cover” on page 134
.
3. Complete the parts replacement. See
“Complete the parts replacement” on page 140
Remove the VGA cable (3.5-inch drive model)
Use this information to remove the VGA cable for the 3.5-inch drive model.
About this task
Attention:
• Read the following section(s) to ensure that you work safely.
–
–
“Installation Guidelines” on page 51
• Turn off the server. Disconnect the power cords and all external cables. See
• If the server is installed in a rack, remove the server from the rack.
Watch the procedure
A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
Procedure
Step 1. Make preparations for this task.
a. Remove the top cover. See
“Remove the top cover” on page 132
b. Disconnect the VGA cable. See
“Front panel cable routing” on page 35
.
Step 2. Remove the VGA cover.
.
Hardware replacement procedures
137
Содержание 7D7Q
Страница 1: ...ThinkSystem SR250 V2 Maintenance Manual Machine Types 7D7Q and 7D7R ...
Страница 8: ...vi ThinkSystem SR250 V2 Maintenance Manual ...
Страница 20: ...12 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 35: ...2 5 inch drive model Figure 26 Server components 2 5 inch drive model Chapter 2 Server components 27 ...
Страница 42: ...34 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 176: ...168 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 180: ...172 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 183: ......
Страница 184: ......