b. Disconnect the front operator panel cables from the system board. See
.
Step 2. Remove two screws that secure the front operator panel.
Figure 67. Front operator panel screws removal
Step 3. Slide the front operator panel out of the server.
Figure 68. Front operator panel removal
After you finish
If you are instructed to return the component or optional device, follow all packaging instructions, and use
any packaging materials for shipping that are supplied to you.
Install the front operator panel (2.5-inch drive model)
Use this information to install the front operator panel (2.5-inch drive model).
About this task
Attention:
Read the following section(s) to ensure that you work safely.
•
•
“Installation Guidelines” on page 51
Watch the procedure
82
ThinkSystem SR250 V2 Maintenance Manual
Содержание 7D7Q
Страница 1: ...ThinkSystem SR250 V2 Maintenance Manual Machine Types 7D7Q and 7D7R ...
Страница 8: ...vi ThinkSystem SR250 V2 Maintenance Manual ...
Страница 20: ...12 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 35: ...2 5 inch drive model Figure 26 Server components 2 5 inch drive model Chapter 2 Server components 27 ...
Страница 42: ...34 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 176: ...168 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 180: ...172 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 183: ......
Страница 184: ......