Figure 66. Flash power module installation
a.
Insert the end of the flash power module into its carrier.
b.
Rotate the flash power module down into the carrier until the tab clicks in place to secure it.
After you finish
1. Connect the flash power module cable to the RAID adapter. See
“Flash power module cable routing” on
.
2. Install the top cover. See
“Install the top cover” on page 134
3. Complete the parts replacement. See
“Complete the parts replacement” on page 140
Front operator panel replacement
Use this procedure to remove or install the front operator panel.
Remove the front operator panel (2.5-inch drive model)
Use this information to remove the front operator panel (2.5-inch drive model).
About this task
Attention:
• Read the following section(s) to ensure that you work safely.
–
–
“Installation Guidelines” on page 51
• Power off the server and peripheral devices and disconnect the power cords and all external cables. See
“Power off the server” on page 11
.
• If the server is installed in a rack, remove the server from the rack.
Watch the procedure
A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
Procedure
Step 1. Make preparations for this task.
a. Remove the top cover. See
“Remove the top cover” on page 132
.
Hardware replacement procedures
81
Содержание 7D7Q
Страница 1: ...ThinkSystem SR250 V2 Maintenance Manual Machine Types 7D7Q and 7D7R ...
Страница 8: ...vi ThinkSystem SR250 V2 Maintenance Manual ...
Страница 20: ...12 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 35: ...2 5 inch drive model Figure 26 Server components 2 5 inch drive model Chapter 2 Server components 27 ...
Страница 42: ...34 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 176: ...168 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 180: ...172 ThinkSystem SR250 V2 Maintenance Manual ...
Страница 183: ......
Страница 184: ......