FRESH AIR WOOD
e-BALTIC-IOM-2020.12-EN
60
FRESH AIR WOOD
INSTALLING
The fresh air hood has to be opened and secured during commissioning.
The 3 parts of the fresh air hood have to be assembled thanks to self-taping screws delivered in the spare part box Check the
proper position of the black seal on the top of the hood cover.
Install the remote fume hoods in a safe place without risk of aspiration of dust, grease, gas and hazardous materials.
WIND DIRECTION
The prevailing wind has to be considered while choosing the machine position on the building roof.
It’s hi
ghly recommended to avoid putting the fresh air hood in the prevailing wind direction to avoid water ingress risks. If this
is not possible please contact us to require specific water droplet strainer in the hood section.
WARNING: the fresh air hood
cover can hurt your head if you don’t pay attention while turning around the unit.
Содержание e-Baltic D BOX 55
Страница 51: ...HEAT RECOVERY e BALTIC IOM 2020 12 EN 48 STEP 3 FITTING STEP 4 CHECK 0 15 mm SAME LEVEL...
Страница 91: ......