HEAT RECOVERY
e-BALTIC-IOM-2020.12-EN
41
HEAT RECOVERY INSTALLATION C, D, E BOX (ERVF + HRMV)
:
1.
Install the flowcurb.
2.
Before installing the rooftop
a.
Fix the brackets (5 pieces) on the curb by 24
screws(6x16mm);
b.
ADJUST the position of the attachment
bracket so that it is 5 mm above the support
surface (without the foam);
c.
Install the foam (25x10 mm) on the upper part
of the flowcurb.
3.
a.
Fix the lower mounting bar of the heat
recovery module using 4 screws (6x16 mm)
and remove the side doors;
b. Make sure that the foam is not damaged (20x15 mm).
4.
Install the rooftop and remove the lifting covers.
5.
Place the two upper mounting bars
through the two top slots.
6.
Install the heat recovery module on the
bracket by taking care to position properly
the lower mounting bar.
Don't forget to remove the lifting covers from the
module.
7.
Slide the 'T' plate into the lifting lug and place the bolt through it. On the opposite side, place
also the bolt (detail A).
8.
Finally tighten the heat recovery module with the 4 bolts
8x60mm to compress the foam (2 bolts on the upper mounting bars
(detail B) and the 2 bolts placed in step 7).
3b
3a
x4
2a
x6
x2
mm
2B
Détail A
Détail B
Содержание e-Baltic D BOX 55
Страница 51: ...HEAT RECOVERY e BALTIC IOM 2020 12 EN 48 STEP 3 FITTING STEP 4 CHECK 0 15 mm SAME LEVEL...
Страница 91: ......