INSTALLATION
e-BALTIC-IOM-2020.12-EN
28
CUSTUMER WIRING
VERTICAL CUSTOMER WIRING C, D, E, E+ BOX
1-
Remove the indicated plate.
Drill the sheet metal to the diameter of the cable glands
It is recommended to use only one cable per cable gland
2-
Place the cable glands on the plate.
3-
Wire through the plate.
4-
Replace the plate.
Содержание e-Baltic D BOX 55
Страница 51: ...HEAT RECOVERY e BALTIC IOM 2020 12 EN 48 STEP 3 FITTING STEP 4 CHECK 0 15 mm SAME LEVEL...
Страница 91: ......