69
4.4
Calibrate slope correction
Mode of procedure:
• Put the hydraulic hillside correction into the central position by
pressing switch E on the operating unit
11
13
12
The central position has been reached when the lower rectangular
tube (13) of the pendulum frame is parallel to the carrying frame
(12). The central position can be determined with aid of a water
leveller in the boom, while the machine is standing on a horizontal
surface.
AUTO
OK
M
E
• The display (M) for the position of the hydraulic hillside
correction on the display of the operating unit must now also be
precisely in the central position.
• If this is not the case, the central position must be re-calibrated
in the Setting and Service Menu of the spray computer.
• Mode of procedure in the Flowmate Control FMC:
̵
In the Setting menu (SETUP FUNCTIONS) of the
Flowmate Control FMC select Screen 8 with the help of
the keys.
̵
By pressing the
OK
key you reach the Input mode, the
display for the central position “
OK
= 0” flashes.
̵
Confirm the display with the
OK
key, till the control unit
sounds two short peeps, which re-calibrates the central
position.
The middle position is now calibrated
Содержание TS-T
Страница 5: ...1 2 EC connections 5 For more information please also check the inside of the PCB housing ...
Страница 13: ...13 2 2 Standard Splitterbox connections ...
Страница 17: ...17 2 3 SHC Box input connections ...
Страница 35: ...35 2 4 8 Total overview SHC hydraulic section ...
Страница 38: ...38 2 5 2 2 SHC boxes hydraulics 2 5 3 2 SHC Boxes water sections ...
Страница 45: ...45 2 7 1 ASV system overview Fuse inside Fuse inside ...
Страница 46: ...46 2 7 2 ASV inside Important Please check the jumper positions Mounted Jumper placed Trailed Jumper removed ...
Страница 55: ...55 3 3 Cable and sensor test 3 3 1 Speed sensor machine and flow sensor test Metal ...
Страница 56: ...56 3 3 Cable and sensor test 3 3 Locking sensor test ...