25
2.3.5
Pressure sensor
In some cases sprayers are equipped with a pressure sensor
instead of a flow meter (for example semi continue system)
The pressure sensor must be connected to the SHC-PCB at
position ANA 1. The locking LED must than be connected to the
DIG 2 (flow sensor connection)
Attention:
Check the position of the jumper on the PCB!
Pressure sensor
Used on
Colour
Contact
Sprayers equipped with
an pressure sensor
Brown
+ (12V)
Black
signal
blue
-
yel
low
gr
een
red
bl
ac
k
red
bl
ac
k
green
white
brown
blue
black
brown
brown
black
blue
grey
yellow
brown
green
white
white
green
brown
normal jmper position
5V
jumper position for
pressure sensor
"Huba" 12V
AUTO
sensor locking
Machines with one SHC-box:
P sensor
Содержание TS-T
Страница 5: ...1 2 EC connections 5 For more information please also check the inside of the PCB housing ...
Страница 13: ...13 2 2 Standard Splitterbox connections ...
Страница 17: ...17 2 3 SHC Box input connections ...
Страница 35: ...35 2 4 8 Total overview SHC hydraulic section ...
Страница 38: ...38 2 5 2 2 SHC boxes hydraulics 2 5 3 2 SHC Boxes water sections ...
Страница 45: ...45 2 7 1 ASV system overview Fuse inside Fuse inside ...
Страница 46: ...46 2 7 2 ASV inside Important Please check the jumper positions Mounted Jumper placed Trailed Jumper removed ...
Страница 55: ...55 3 3 Cable and sensor test 3 3 1 Speed sensor machine and flow sensor test Metal ...
Страница 56: ...56 3 3 Cable and sensor test 3 3 Locking sensor test ...