92
5.3
Testing screens
5.4
Calibrating electronic level indicator
For a good calibration process please follow up the steps one by one.
Step 1.
Calibrate your spray flow meters in a correct and precise way. (look in your instruction manual for more detailed information.
Step 2.
Fill up the tank with clean water.
The tank has to be filled with the Normal t100 liter (Ixter)+40Liter (Ikarus S).
Make sure the float in the tank is not touching the top of the tank. (Special attention with Ikarus S)
To fill the tank with a not calibrated machine can only be done in the filter cleaning position.
Step 3.
Go to screen
Calibration
Step 4.
Press the
Button and the screen
will appear.
Step 5.
Press the
Button and the screen
will pop-up
Содержание TS-T
Страница 5: ...1 2 EC connections 5 For more information please also check the inside of the PCB housing ...
Страница 13: ...13 2 2 Standard Splitterbox connections ...
Страница 17: ...17 2 3 SHC Box input connections ...
Страница 35: ...35 2 4 8 Total overview SHC hydraulic section ...
Страница 38: ...38 2 5 2 2 SHC boxes hydraulics 2 5 3 2 SHC Boxes water sections ...
Страница 45: ...45 2 7 1 ASV system overview Fuse inside Fuse inside ...
Страница 46: ...46 2 7 2 ASV inside Important Please check the jumper positions Mounted Jumper placed Trailed Jumper removed ...
Страница 55: ...55 3 3 Cable and sensor test 3 3 1 Speed sensor machine and flow sensor test Metal ...
Страница 56: ...56 3 3 Cable and sensor test 3 3 Locking sensor test ...