Initial Powering Operations for the 990-FX Line
2-33
KVAL Operation/Service Manual
Initial Powering Operations for the 990-FX Line
This section describes how to power up and to power down the 990-FX Line.
Powering up the system includes:
• Applying power to the entire system
• Starting the Control Circuit
Powering down the system includes:
• Shutting down the control power
• Removing power from the entire system
How to Power Up the Line
1.
Ensure factory air is applied to each machine and main air supply is turned on.
2.
Check that all E-Stop buttons are out and safety gates are closed.
Note:
A pop-up is displayed on the user screen if an E-Stop is pressed. The pop-up will
indicate which E-Stop has been activated
3.
Make sure the electrical disconnect each electrical
cabinet is turned to the ON position.
4.
Switch the green
CONTROL TRANSFORMER
switches to the ON positions. They
should light up.
5.
Push the green
START MACHINE
buttons to “boot up” the machines.
Note:
Boot up may take 2 to 3 minutes.
Control Transformer Switch
Start Machine
Содержание 990FX
Страница 4: ...KVAL 990 FX Operation Service Manual ...
Страница 30: ...Safety Sign Off Sheet KVAL 990 FX Operation Service Manual 1 20 ...
Страница 85: ...Glossary of Common Terms 2 55 KVAL Operation Service Manual ...
Страница 90: ...System IT Administration 3 5 KVAL Operation Service Manual ...
Страница 129: ...Collet Torque Values 4 39 KVAL 990 FX Operation Service Manual ...
Страница 130: ...Collet Torque Values KVAL 990 FX Operation Service Manual 4 40 ...
Страница 164: ...Network System Overview KVAL Operation Service Manual 5 34 ...
Страница 168: ...KVAL 990 FX Operation Service Manual ...
Страница 169: ......
Страница 170: ......
Страница 171: ......