
VI - 7
Settings
6.5 Baling Ram Setting
The bale chamber is equipped with two blades (6).
• The baling ram (3) on the
Big Pack 127/128
is
equipped with seven blades (5).
• The baling ram (3) on the
Big Pack 88
on the other
hand is only fitted with five blades (5) due to the
smaller width of the bale chamber.
Adjusting the Baling Ram Blades
The baling ram blades must be set precisely to obtain a
smooth surface on the underside of the pack. To adjust
the distance to "
a" = 2 mm
the height of the baling ram
can be adjusted with the eccentric sleeves (2) on the
guide rollers. After separating the two halves of the
clamp bedding (1), the eccentric sleeves are turned to
raise and lower the baling ram. After making the adjust-
ment, the tighten the two halves of the clamp bedding
again. Make sure that the guide rails (4) and the guide
rollers do not become dirty. This can lead to increased
wear and an imprecise height setting of the baling ram.
•
The guide rollers for the baling ram must carry uniformly.
•
The gap between the baling ram blade and the blades in the bale channel must be uniform
over the whole width of the ram.
1 2 3
4
5
6
2
1
a
BP 380-7-062
BP380-7-063
a
1
2
2
1
3
6.5 Guide Rail Cleaning
There are cleaning rails attached to the four baling ram
rollers (3), which clear the baling ram guide rails of
deposits of dirt.
To make the adjustment undo screws (1) and set the
cleaning rails to the dimension
a = 1–2 mm.
Tighten
up the screws again.
Die Reinigungsschienen (2) müssen leicht
um die Rollenachse kippen können!
Содержание Big Pack 127 / MultiCut
Страница 10: ...I 6 General Information ...
Страница 15: ...II 5 Safety ...
Страница 22: ...II 12 Safety ...
Страница 46: ...IV 10 Comfort Controls ...
Страница 70: ...VI 16 Settings ...
Страница 90: ...X 2 ...
Страница 92: ...XI 2 Putting into Operation Again ...
Страница 114: ...XII 22 Special Equipment ...
Страница 122: ...XIII 8 Faults their Causes and Elimination ...