
XII - 10
Special Equipment
Folding the bale chute in and out
To fold out the bale chute (1), lift the safety collar (2)
and move the operating lever (3) to position (B).
To fold in the bale chute (1), lift the safety collar (2) and
move the operating lever (3) to position (A).
The residual bale ejector is operated using the right-
hand operating lever.
Lift the safety collar (1) and move the operating
lever (2) to position (A) or (B).
Position (
A
): residual bale ejector moves forwards
Position (
B
): residual bale ejector moves backwards
BP380-7-126
BP380-7-127
Содержание Big Pack 127 / MultiCut
Страница 10: ...I 6 General Information ...
Страница 15: ...II 5 Safety ...
Страница 22: ...II 12 Safety ...
Страница 46: ...IV 10 Comfort Controls ...
Страница 70: ...VI 16 Settings ...
Страница 90: ...X 2 ...
Страница 92: ...XI 2 Putting into Operation Again ...
Страница 114: ...XII 22 Special Equipment ...
Страница 122: ...XIII 8 Faults their Causes and Elimination ...