Chapter 12 Replacing Loading Parts in the Exterior of Main Unit
12-6
12.3 Replacing LCD Board
Replace the message display LCD board on the operation panel.
Work outline
The number of personnel and the estimated work hours required to replace loading parts is as follows:
Requirements
The procedure for replacing loading parts requires the following tools:
1
Remove the exterior of the operation panel with
reference to
“
Removal Procedure (Page 12-
3)”
in
“12.2 Removing/Installing Exterior of
Operation Panel”
.
2
Remove the operation panel.
Push out the operation panel by pressing down the tab on the
operation panel.
3
Remove the cover.
• Two screws (M3
×
6)
Caution
•
Be sure to turn off power and remove the power cable from the electrical outlet before
removing or installing the exterior cover or replacing loading parts.
•
To avoid damage to the board caused by electrostatic discharge, wear a wrist grounding
strap with reference to
“3.4 Installing a Grounding Strap (Page 3-24)”
when accessing the
board for work.
Number of
Personnel
Work Hours
1
10 minutes
No.
Tools
No.
Tools
1
Various types of screwdrivers
2
Tray (container for screws and parts removed)
3
LCD board (for replacement)
4
Grounding strap
Caution
When replacing loading parts, be sure to
replace with the tray shutter attached. If
some of the film remains on the tray, the film
may be exposed.
Содержание Drypro 832
Страница 2: ......
Страница 12: ......
Страница 15: ...Chapter 1 Safety Precautions and Warnings 1 3 5 Laser Power Label No Precautions Warning Labels ...
Страница 22: ......
Страница 28: ......
Страница 74: ......
Страница 118: ......
Страница 228: ......
Страница 242: ......
Страница 260: ...Chapter 14 Setting and Adjustment 14 4 6 Click the PRINT button The ST13A PATTERN is printed Example ST13A PATTERN ...
Страница 263: ...Chapter 14 Setting and Adjustment 14 7 12 Click the PRINT button The ST13B PATTERN is printed Example ST13B PATTERN ...
Страница 265: ...Chapter 14 Setting and Adjustment 14 9 16 Click the PRINT button The ST13C PATTERN is printed Example ST13C PATTERN ...
Страница 388: ......
Страница 498: ......
Страница 521: ...18 23 18 5 Block Diagram ...
Страница 527: ...18 29 18 7 Printing Operation Load Timing Chart Standard 1 ch ...
Страница 529: ......