Chapter 11 Replacing Loading Parts in Main Unit
11-13
10
Install the lid removed in
step 7
on the control box.
• Nine screws (M3
×
6)
11
Install the control box assembly removed in
step 6
.
• Four screws (M3
×
6)
12
Install the control board duct unit assembly removed in
step 5
.
• Three screws (M3
×
6)
13
Connect the connector (JP24) removed in
step 4
.
14
Connect the connectors removed in
step 3
to MEC IF (CCN5), exposure IF (CCN6), and power
supply (JP52).
15
Install the connector cover removed in
step 2
.
16
Install the LAN cover and film ejection tray with reference to
“
Installation Procedure (Page
3-11)”
in
“3.3.2 Removing/Installing Film Ejection Tray”
.
This is the end of the process of replacing the compact flash.
Caution
Be sure to push the connector all the way in when connecting it.
If the connector is not connected properly, an error will occur and, in some cases, smoke and/or
an odor may be generated.
Caution
Be sure to push the connector all the way in when connecting it.
If the connector is not connected properly, an error will occur and, in some cases, smoke and/or
an odor may be generated.
Содержание Drypro 832
Страница 2: ......
Страница 12: ......
Страница 15: ...Chapter 1 Safety Precautions and Warnings 1 3 5 Laser Power Label No Precautions Warning Labels ...
Страница 22: ......
Страница 28: ......
Страница 74: ......
Страница 118: ......
Страница 228: ......
Страница 242: ......
Страница 260: ...Chapter 14 Setting and Adjustment 14 4 6 Click the PRINT button The ST13A PATTERN is printed Example ST13A PATTERN ...
Страница 263: ...Chapter 14 Setting and Adjustment 14 7 12 Click the PRINT button The ST13B PATTERN is printed Example ST13B PATTERN ...
Страница 265: ...Chapter 14 Setting and Adjustment 14 9 16 Click the PRINT button The ST13C PATTERN is printed Example ST13C PATTERN ...
Страница 388: ......
Страница 498: ......
Страница 521: ...18 23 18 5 Block Diagram ...
Страница 527: ...18 29 18 7 Printing Operation Load Timing Chart Standard 1 ch ...
Страница 529: ......