27
5. Installation
5.1 Selection of qualified personnel
It is advisable to have trained KNECHT personnel perform the installation
work on the grinding machine.
We assume no liability for damage caused by improper installation.
CAUTION
5.2 Installation site
When determining the installation site, bear in mind the space requirement for installation,
maintenance and repair work on the grinding machine (see Chapter 3.2).
The machine may only be stored or operated in dry rooms.
5.3 Supply connections
The grinding machine is delivered ready for connection with the appropriate connection cable.
Have a qualified electrician on site install the current supply.
Have the compressed air supply and the connection with the power supply installed on site by a
specialist.
Connect compressed air only when the doors are closed.
Never cut off the compressed air while the knives are clamped.
This can result in serious injuries.
CAUTION
5.4 Settings
The various components and the electrics are adjusted by KNECHT Maschinenbau GmbH before
delivery.
ATTENTION
Unauthorized changes to set values are not
permitted and may damage the grinding
machine.