26
For transporting the machine, the locally applicable safety and accident
prevention regulations must be observed.
Only transport the machine in upright position (with the machine feet
facing downwards).
CAUTION
4.1 Transport Aids
For transporting and for setting up the grinding machine, only use adequately dimensioned
means of transport, e.g. truck, forklift or hydraulic lift truck. Remove the water bowl before trans-
porting.
When using a forklift or a lift truck, move the fork under the grinding machine.
Bear in mind the center of gravity of the machine. The center of gravity (CoG) is shown in figure
3-1.
4.2 Transport damage
If damage is detected following unloading after acceptance of the delivery, inform KNECHT
Maschinenbau GmbH and the freight forwarder about it immediately. If required, consult an
independent expert immediately.
Remove the packaging and shipping straps. Remove the shipping straps on the grinding machine.
Dispose of the packaging in an environmentally friendly way.
4.3 Transport to another installation site
For transport to another installation site, ensure that the space requirements are fulfilled (see
Chapter 3.2).
Reliable electrical and pneumatic connections must be provided at the new installation site. The
grinding machine must be stable and firmly placed.
Installations on the electrical system may only be performed by an
authorized specialist or our customer service staff. Observe the locally
applicable safety and accident prevention regulations.
CAUTION
4. Transport