Keysight N5247B Service Guide 7-19
Repair and Replacement Procedures
Removing and Replacing the A4–A17 Boards
4.
Instructions for A4, A7, A8, A12, A13, A14, A15, A16, and A17 boards:
a.
Remove all cables connected to the top of the board to be removed.
Note the location of each cable for reinstallation.
b.
Lift the two extractors (item
), one at each end of the board, and
lift the board.
c.
Before removing the board, check the bottom of the board for any
attached cables.
Replacement Procedure
1.
Reverse the order of the removal procedure.
Remember to connect any necessary cables to the bottom of the board
before reinstalling it. If replacing a doubler board, make sure the new
board has loads connected to the same ports as were used on the old
board. This may require moving a load from the old board to the new board
or removing the load from the new board.
When replacing the A5 or A10 source board, remove the semirigid cables
attached to the bottom of the old board and attach them to the bottom of
the new board. Be sure to orient these cables the same as they were on
the old board.
2.
Perform the post-repair adjustments, verifications, and performance tests
that pertain to this removal procedure. Refer to
.
The A4, A15, and A17 synthesizer boards will not perform correctly and
will cause the PNA to display errors until the Synthesizer Bandwidth
Adjustment and the EE Default Adjustment are completed, as per
.
If you have a new A15 version 7 synthesizer assembly installed, the A15
assembly will not perform correctly and will cause the PNA to display
errors until the EE Default Adjustment synthesizer adjustments are
completed, as per
Содержание N5247B
Страница 10: ...10 Keysight N5247B Service Guide Contents ...
Страница 96: ...3 66 Keysight N5247B Service Guide Tests and Adjustments Adjustments 3 ...
Страница 157: ...Keysight N5247B Service Guide 4 61 Troubleshooting This page left intentionally blank ...
Страница 227: ...Keysight N5247B Service Guide 5 57 Theory of Operation Receiver Group Operation Figure 5 18 4 Port Receiver Group ...
Страница 228: ...5 58 Keysight N5247B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 19 2 Port Receiver Group ...
Страница 238: ...5 68 Keysight N5247B Service Guide Theory of Operation Noise Measurement Group Operation Option 029 5 ...
Страница 243: ...Keysight N5247B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure ...
Страница 268: ...6 30 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 270: ...6 32 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 373: ...Keysight N5247B Service Guide 6 135 Replaceable Parts Replaceable Parts Listings ...
Страница 381: ...Keysight N5247B Service Guide 6 143 Replaceable Parts Replaceable Parts Listings This page intentionally left blank ...
Страница 426: ...6 188 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 548: ...7 104 Keysight N5247B Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 565: ...Installation Note Xxxxx xxxxx 3 ...