7-34 Keysight N5247B Service Guide
Repair and Replacement Procedures
Removing and Replacing the A24 IF Multiplexer Board
7-
Removing and Replacing the A24 IF Multiplexer Board
Tools Required
— T-10 TORX driver (set to 9 in-lb)
— T-20 TORX driver (set to 21 in-lb)
— 5/16 inch open-end torque wrench (set to 10 in-lb)
— ESD grounding wrist strap
Removal Procedure
Refer to
for this procedure.
1.
Disconnect the power cord.
2.
Remove the outer cover. Refer to
“Removing the Covers” on page 7-6
3.
Position the analyzer bottom side up.
4.
Remove the A23 test set motherboard. Refer to
the A23 Test Set Motherboard” on page 7-32
5.
Disconnect the ribbon cable (item
) from the A24 IF multiplexer board.
6.
Disconnect ALL gray flexible RF cables (item
) from the A24 IF
multiplexer board.
7.
Remove connector hardware (item
) from five rear panel RF connectors.
8.
Remove connector hardware (item
) from the rear panel PULSE I/O
connector.
9.
Remove four screws (item
) from the stabilizer bracket and remove the
stabilizer bracket.
10.
Remove four screws (item
) from the A24 IF multiplexer board.
11.
Slide the A24 IF multiplexer board toward the front of the instrument until
the rear panel connectors are free of the rear panel, then lift the
motherboard and remove it from the analyzer.
Replacement Procedure
1.
Reverse the order of the removal procedure.
Attach the stabilizer bracket to the new A24 IF multiplexer board using the
screws removed from the old one.
Torque rear panel RF connector nuts to 21 in-lbs and PULSE I/O connector
screws to 6 in-lbs.
2.
Perform the post-repair adjustments, verifications, and performance tests
that pertain to this removal procedure. Refer to
.
Содержание N5247B
Страница 10: ...10 Keysight N5247B Service Guide Contents ...
Страница 96: ...3 66 Keysight N5247B Service Guide Tests and Adjustments Adjustments 3 ...
Страница 157: ...Keysight N5247B Service Guide 4 61 Troubleshooting This page left intentionally blank ...
Страница 227: ...Keysight N5247B Service Guide 5 57 Theory of Operation Receiver Group Operation Figure 5 18 4 Port Receiver Group ...
Страница 228: ...5 58 Keysight N5247B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 19 2 Port Receiver Group ...
Страница 238: ...5 68 Keysight N5247B Service Guide Theory of Operation Noise Measurement Group Operation Option 029 5 ...
Страница 243: ...Keysight N5247B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure ...
Страница 268: ...6 30 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 270: ...6 32 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 373: ...Keysight N5247B Service Guide 6 135 Replaceable Parts Replaceable Parts Listings ...
Страница 381: ...Keysight N5247B Service Guide 6 143 Replaceable Parts Replaceable Parts Listings This page intentionally left blank ...
Страница 426: ...6 188 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 548: ...7 104 Keysight N5247B Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 565: ...Installation Note Xxxxx xxxxx 3 ...