7-92 Keysight N5247B Service Guide
Repair and Replacement Procedures
Post-Repair Procedures
7-
Post-Repair Procedures
After the replacement of an assembly, you must perform the service
procedures in the order listed in
.
Procedures referenced in this table are located in
unless specified otherwise.
STOP!
Before returning the repaired instrument to the customer, it is
critical to ensure the product is safe for use. Before powering on the
instrument, verify there is ground continuity between the ground
terminal on the AC Inlet and the metal frame of the product. It is
also critical to perform a voltage test on the outer surfaces of the
product to confirm the instrument does not present an electric
shock hazard.
IMPORTANT!
Before you begin any testing on a System or instrument,
always inspect the connectors on the instrument, the calibration kit,
cables and adapters.
IMPORTANT!
For the most current information on the
Performance, and Other Tests and Procedures” column’s content, refer to
https://cal.software.keysight.com/PNA/Help/N7840AWebHelp.htm
.
to review where the
calibration stickers should be placed on the PNA.
Table 7-2
Related Service Procedures
Replaced Assembly
Adjustments
and Other Procedures
Verification, Performance,
and Other Tests and Procedures
A1 front panel display board
No adjustment needed
Front Panel Keypad and RPG Test
and
A2 USB board
No adjustment needed
Check for proper operation
A3 display assembly
Содержание N5247B
Страница 10: ...10 Keysight N5247B Service Guide Contents ...
Страница 96: ...3 66 Keysight N5247B Service Guide Tests and Adjustments Adjustments 3 ...
Страница 157: ...Keysight N5247B Service Guide 4 61 Troubleshooting This page left intentionally blank ...
Страница 227: ...Keysight N5247B Service Guide 5 57 Theory of Operation Receiver Group Operation Figure 5 18 4 Port Receiver Group ...
Страница 228: ...5 58 Keysight N5247B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 19 2 Port Receiver Group ...
Страница 238: ...5 68 Keysight N5247B Service Guide Theory of Operation Noise Measurement Group Operation Option 029 5 ...
Страница 243: ...Keysight N5247B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure ...
Страница 268: ...6 30 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 270: ...6 32 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 373: ...Keysight N5247B Service Guide 6 135 Replaceable Parts Replaceable Parts Listings ...
Страница 381: ...Keysight N5247B Service Guide 6 143 Replaceable Parts Replaceable Parts Listings This page intentionally left blank ...
Страница 426: ...6 188 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 548: ...7 104 Keysight N5247B Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 565: ...Installation Note Xxxxx xxxxx 3 ...