4-10 Keysight N5247B Service Guide
Troubleshooting
Power Up Troubleshooting
4-
If All Supply Voltages are Present
If all of the supplies have measured within tolerances, and the instrument still
is not functioning properly, refer to
“Front Panel Troubleshooting” on
If Any Supply Voltage Is Missing
You must sequentially remove all of the assemblies, taking care to disconnect
the line power cord before each removal, and then measure the supply
voltages after each removal.
If the missing supply voltages return to a “power on” condition after removal of
an assembly, suspect that assembly as being defective.
Remove the network analyzer assemblies in the order specified in the following
steps (refer to
for removal instructions).
1.
Unplug the A23 test set motherboard ribbon cable from the A23 test set
motherboard (refer to
“Removing and Replacing the A23 Test Set
2.
Unplug the A23 test set motherboard to A24 IF multiplexer board ribbon
cable from the A24 IF multiplexer board (refer to
the A24 IF Multiplexer Board” on page 7-34
Table 4-1
Power Supply Measurement Points
Test Point
Supply Name
Expected Level
(Vdc)
Test Point
Supply Name
Expected Level
(Vdc)
TP517
Analog Ground
0 V
TP516
−
5.2 V analog
−
5.2 ±0.1
TP509
+15 V analog
+
15.0 ±0.1
TP514
−
7 V analog
−
7.0 ±0.1
TP511
+9 V analog
+
9.0 ±0.1
TP500
Digital Ground
0 V
TP515
+3.5 V analog
+3.5 ±0.1
TP502
+5.1 V standby
+5.1 ±0.1
TP513
+5.2 V analog
+5.2 ±0.1
TP503
+12 V digital
+12.0 ±0.1
TP501
+15 V standby
+15.0 ±0.1
TP507
+3.35 V digital
+3.35 ±0.1
TP504
+32 V analog
+32.0 ±0.1
TP505
+5.1 V digital
+5.1 ±0.1
TP512
−
15 V analog
−
15.0 ±0.1
TP519
Digital Ground
0 V
Disconnect the line-power cord before removing any assembly.
Procedures described in this document may be performed with
power supplied to the product while protective covers are removed.
Energy available at many points may, if contacted, result in personal
injury or loss of life.
Содержание N5247B
Страница 10: ...10 Keysight N5247B Service Guide Contents ...
Страница 96: ...3 66 Keysight N5247B Service Guide Tests and Adjustments Adjustments 3 ...
Страница 157: ...Keysight N5247B Service Guide 4 61 Troubleshooting This page left intentionally blank ...
Страница 227: ...Keysight N5247B Service Guide 5 57 Theory of Operation Receiver Group Operation Figure 5 18 4 Port Receiver Group ...
Страница 228: ...5 58 Keysight N5247B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 19 2 Port Receiver Group ...
Страница 238: ...5 68 Keysight N5247B Service Guide Theory of Operation Noise Measurement Group Operation Option 029 5 ...
Страница 243: ...Keysight N5247B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure ...
Страница 268: ...6 30 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 270: ...6 32 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 373: ...Keysight N5247B Service Guide 6 135 Replaceable Parts Replaceable Parts Listings ...
Страница 381: ...Keysight N5247B Service Guide 6 143 Replaceable Parts Replaceable Parts Listings This page intentionally left blank ...
Страница 426: ...6 188 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 548: ...7 104 Keysight N5247B Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 565: ...Installation Note Xxxxx xxxxx 3 ...